Underwriting

Industrial IC Narrative and Deal Memo Framework

An industrial IC memo should not be a polished description of why industrial is attractive. It should be a challengeable decision artifact that shows why this asset, at this basis, with this tenant universe, this physical spec, this capital stack, and this downside protection deserves capital.

Also known as: Industrial Deal Memo Framework, Industrial IC Memo, Industrial Investment Committee Narrative

Updated

Use this page with Investment Committee Memos and Deal Screening, Industrial Valuation and Probability-Weighted Underwriting, Industrial Location and Tenant Demand Underwriting, Industrial CapEx and Physical Risk Underwriting, Industrial Asset Taxonomy, Industrial Building Specifications, Tenant Credit Analysis Framework, Sensitivity and Scenario Analysis, and Acquisition-to-Asset-Management Handoff.

IC Narrative Spine

The industrial memo should reduce the deal to a small set of arguments that can be tested directly:

Decision = approve / pursue / reprice / defer / reject

Why this asset?
Why this industrial subtype?
Why this corridor and tenant universe?
Why this basis?
Why this capital stack?
Why now?
What breaks first?
What must be true after close?

The narrative should be written backward from the decision. If the recommendation is approval, the memo must state the required price, protections, diligence conditions, and post-close controls. If the recommendation is pursue or reprice, the memo must identify what evidence would move the deal into approval-ready status. If the recommendation is pass, the memo should preserve the reason so future teams do not recycle the same weak thesis.

Decision Box

Every industrial IC memo should open with a decision box:

FieldRequired Content
Recommendationapprove, pursue, reprice, reserve, defer, or reject
Maximum price / basisprice, $/SF or $/acre, going-in yield, and replacement-cost check
Return targetunlevered return, levered IRR, equity multiple, cash yield, and payback where relevant
Strategycore, core-plus, value-add, development, IOS, powered land, sale-leaseback, or special situation
Required protectionsdebt terms, reserves, escrows, environmental clearance, estoppels, insurance quote, PSA rights
Main source of returnin-place yield, MTM, lease-up, development spread, basis reset, land optionality, or credit income
Primary risktenant loss, rollover, oversupply, physical obsolescence, CapEx, environmental, debt/refi, or exit liquidity
Open conditionsevidence still required before hard deposit or close

The point is to make the recommendation falsifiable. A memo that does not state what would change the decision is not ready for IC.

One-Sentence Thesis

The one-sentence thesis should contain three elements:

We should [action] because [source of return] is available at [defensible basis],
while [primary risk] is controlled by [specific protection or evidence].

Examples of stronger industrial thesis language:

  • "Acquire the shallow-bay park at a below-replacement-cost basis because diversified local tenant demand supports staged MTM capture, while near-term rollover risk is controlled by small-suite demand depth and limited direct supply."
  • "Proceed only after repricing because the building has a credible location thesis, but the current value relies on Class A rents despite a truck-court and clear-height profile that narrows the tenant universe."
  • "Approve the IOS acquisition only if usable-acreage, zoning durability, environmental scope, and lender treatment are confirmed; the thesis is entitled-yard scarcity, not generic industrial rent growth."

Weak thesis language to reject:

  • "Industrial remains a favored asset class."
  • "The location is strong."
  • "There is upside to market rents."
  • "The tenant is a recognizable company."

Those statements may be true, but none is decision-grade until tied to model variables and evidence.

Deal Snapshot

The snapshot should orient the committee without turning into a broker flyer:

CategoryIndustrial-Specific Fields
Assetaddress, submarket, subtype, NRA, acres, usable acres, year built, clear height, dock/drive-in count, truck court, office ratio, power, ESFR, trailer parking
Rent rolloccupancy, tenant count, WALT, largest tenants, rollover by year, in-place rent, market rent, recoveries, security, guaranties
Basispurchase price, $/SF, $/acre, going-in yield, stabilized yield, replacement cost, land value support
Capital stackloan amount, LTV, DSCR, debt yield, rate, amortization, reserves, maturity, extension tests
Business planMTM, lease-up, renewal, re-tenanting, CapEx, development, subdivision, yard monetization, power or entitlement work
Exitterminal NOI, exit cap, buyer pool, hold period, sale/refi alternatives

Mandate and Portfolio Fit

IC should know what portfolio risk budget the deal consumes:

Fit QuestionIndustrial Memo Answer
Strategy sleeveIs this core income, core-plus MTM, value-add leasing, development, IOS yield, powered-land optionality, or special-purpose credit?
Market exposureDoes it add to a target corridor or over-concentrate an existing geography?
Tenant exposureDoes it create single-credit, 3PL, sector, shallow-bay small-business, cold-chain, or manufacturing concentration?
Vintage / pacingDoes the deal fit current deployment pacing and cost-basis discipline?
Leverage / refinance bucketDoes it add maturity-wall, floating-rate, negative-leverage, or refinance-gap risk?
LiquidityWould the portfolio be more or less liquid if this asset had to be sold in a weak market?

The memo should not treat portfolio fit as a generic closing section. It is part of the investment decision. A good standalone asset can still be a bad portfolio addition.

Subtype Selection Gate

The memo must name the primary subtype before presenting comps or cap rates.

Primary Subtype =
  big-box logistics
  last-mile / infill
  multi-tenant shallow bay
  flex / R&D
  cold storage
  IOS
  data center / powered land
  life sciences / lab / cGMP
  heavy manufacturing
  3PL / contract logistics

Subtype controls:

  • tenant universe
  • market rent comp set
  • downtime assumption
  • TI / LC and make-ready assumptions
  • CapEx reserve logic
  • cap-rate comp set
  • lender appetite
  • exit buyer pool

Do not use generic industrial comps unless the asset is genuinely generic. A cold-storage facility, older flex building, entitled IOS yard, powered-land site, cGMP plant, and Class A bulk warehouse are not one denominator.

Tenant Universe Proof

The memo should define the addressable tenant universe before claiming market demand.

Tenant ClassRequired Size / SpecRent CeilingCredit ProfileActive Demand EvidenceFit / Issue
regional logisticsRSF, clear height, docks, truck court, trailer stalls$/SF NNNIG / private / 3PLtours, requirements, comps, broker evidencelease-up probability
local shallow bayunit size, grade doors, parking, office ratio$/SF NNNlocal / regionaloccupancy history, small-bay compschurn / management
manufacturingpower, slab, ventilation, labor, permits$/SF or build-to-suit economicsprivate / corporateuser requirements, supplier clusterspecial-purpose risk
cold-chainrefrigeration, clear height, power, loading, food/pharma accessspecialized rentoperator / usercold-chain demand and equipment lifeCapEx reserve
IOS / fleetusable acres, paving, fencing, zoning, access$/acre/monthcontractor / logistics / fleetyard demand, zoning scarcityenvironmental / municipal

The committee should be able to see how many tenants can use the building, what they can pay, what specs they require, and how long replacement would take.

Location-to-Model Bridge

Industrial location claims must map to underwriting variables.

Location ClaimRequired Model Link
freeway / interchange accessrent premium, tenant universe, route efficiency, downtime
port / intermodal accessdrayage savings, tenant specialization, retention probability
airport accessair-cargo demand, last-mile relevance, buyer liquidity
household densitylast-mile rent ceiling and small-bay service demand
labor access3PL/manufacturing feasibility and tenant retention
zoning scarcitycap-rate/liquidity credit, supply barrier, IOS optionality
power / utility advantagetenant universe, speed-to-energize, powered-land optionality
exurban low basisyield-on-cost or low-basis protection, offset by supply elasticity

If the memo says "good location," it should also state which variable changes: higher rent, faster lease-up, higher renewal probability, lower tenant operating cost, lower cap rate, stronger debt proceeds, or lower exit risk.

Spec-to-Value Matrix

Industrial specs should be presented as economic filters, not descriptive features.

SpecIC QuestionModel Treatment
Clear heightWhich tenant pool can use the cube?rent premium/discount, tenant pool, exit liquidity
Dock ratioCan the building support target throughput?lease-up probability, rent, CapEx if curable
Truck courtCan 53-foot trailers operate without friction?downtime, tenant pool, uncurable site penalty
Trailer parkingIs surplus yard legal, usable, and monetizable?other income, rent premium, IOS optionality
SlabDoes it support target inventory, equipment, or automation?hard gate for manufacturing/cold/ASRS users
ESFRIs high-pile storage frictionless?lease objections, lender/buyer diligence
PowerDoes target use need ordinary warehouse power or specialized capacity?tenant universe, CapEx, energization timing
Office ratioIs office finish functional or obsolete?demolition cost, rent discount, re-tenanting friction
Automation readinessIs there actual tenant demand for the upgrade?rent premium only if supported by tenant universe

The memo should state whether each deficiency is curable, economically curable, or a permanent liquidity issue.

MTM and Rollover Narrative

Gross loss-to-lease is not an IC thesis. The memo should show a probability-weighted path.

Expected MTM Value =
  P_renew x Renewal Case
+ P_replace x Replacement Case
+ P_vacant x Vacancy Case

The IC exhibit should show:

ItemRequired Evidence
Expiring rentlease abstract and rent roll
Market rentexecuted comps, active requirements, broker support, adjusted for size/spec
Capture ratediscount to asking rent and concessions
Renewal probabilitytenant credit, lease criticality, alternatives, rent affordability
Replacement probabilityactive tenant universe and lease-up comps
Downtimecomparable lease-up, block size, supply pipeline
TI/LC/free rentmarket leasing economics
Credit/securityfinancials, guaranty, LOC, deposit

Large single-tenant rollover should be narrated as a binary business-plan risk. It is not the same as ordinary market vacancy.

Cap Rate and Valuation Narrative

The valuation section should reconcile numerator and denominator.

Required exhibits:

  • current NOI and stabilized NOI bridge
  • normalized market-extracted cap-rate comp table
  • cap-rate build-up table
  • Gordon implied-growth check
  • BOI feasibility test
  • DCF-implied exit-cap test
  • replacement-cost and cost-to-cure bridge
  • rejected valuation range

Narrative standard:

The cap rate is appropriate because [market evidence] supports [range],
the build-up method explains [risk/growth spread],
the DCF does not require [unsupported exit compression],
and the basis remains protected under [downside case].

Do not let the memo capitalize the same thesis twice. If infill scarcity is already producing faster lease-up and stronger rent growth, cap-rate compression requires separate buyer/liquidity evidence.

Capital Stack Narrative

Industrial debt should be framed around income durability, tenant loss, and refinanceability.

Debt TopicIC Narrative
LTV / LTChow much basis is protected if rents, cap rates, or costs move
DSCRwhether in-place and downside NOI cover debt service
Debt yieldwhether the loan remains financeable if cap rates widen
Rate / amortizationimpact on cash yield, negative leverage, and payback
Reserves / holdbackslender view of roof, paving, environmental, TI/LC, leasing, and carry
Maturity / extensionrefinance path and tests if exit is delayed
Tenant losscovenant and cash impact if a major tenant leaves
Refi gapequity required if takeout proceeds are lower than planned

The memo should say whether leverage is a return enhancer, a necessary bridge, or a fragility source.

Downside Narrative

IC does not need every sensitivity table in prose. It needs the answer to "what breaks first?"

Industrial downside package:

StressWhat It Tests
exit cap +50 / +100 / +150 bpsterminal value and liquidity dependence
rent growth flat or negativedependence on market beta
lease-up delayed 6 / 12 / 18 monthsdowntime and carry
renewal probability lowerMTM capture fragility
major tenant lossbinary rent-roll risk
TI/LC and CapEx overrunreserve sufficiency
insurance/tax/utility spikeNNN leakage and tenant rent sustainability
refinance proceeds haircutmaturity and gap-equity risk
buyer-pool thinningexit strategy credibility

The memo should summarize:

Base case works because...
Bear case still protects capital because...
Stress case fails when...
The first broken assumption is...
The mitigation is...

If the stress case produces capital loss, the memo should state why that downside is acceptable for the mandate or why the basis must be lower.

Evidence and Assumption Grading

Every material IC claim should carry an evidence grade.

GradeMeaningIC Treatment
Verifiedtied to executed lease, source document, third-party report, lender quote, public source, or diligence filecan support base case
Third-party pendingPCA, Phase I/II, survey, zoning, insurance, appraisal, lender quote, or legal review not finalapproval condition or reserve
Broker-providedcredible but incentive-affected market informationhaircut, triangulate, or keep out of base case
Seller-providedrent roll, T12, CapEx history, tenant claims, recoveriestie out before final IC
Management estimatesponsor/operator judgmentuse in upside or sensitivity unless independently supported
Open questionnot yet supportedcannot carry approval case

The memo should separate source-derived facts from underwriting judgment. IC should know which assumptions are evidence-backed and which are controlled risks.

Approval Conditions

Industrial approval should be conditional when key facts are unresolved.

Common approval conditions:

  • maximum price / minimum yield / retrade threshold
  • minimum DSCR and debt yield
  • signed debt term sheet or lender commitment
  • required estoppels and SNDA package
  • lease abstract and rent-roll tie-out
  • tenant financials, guaranty, LOC, or deposit confirmation
  • PCA scope and lender reserve agreement
  • Phase I/II environmental clearance or quantified reserve
  • roof, paving, slab, dock, sprinkler, power, and truck-court cost-to-cure
  • zoning confirmation, especially for IOS, truck parking, outside storage, heavy industrial, and powered-land uses
  • insurance quote and deductible structure
  • tax reassessment estimate and appeal plan
  • AM acceptance of opening budget, CapEx plan, and risk register

Approval conditions should have owners, deadlines, and consequences. "Subject to diligence" is not specific enough.

Industrial IC Red Flags

Pre-IC challenge checklist:

  • generic industrial thesis with no subtype-specific comp set
  • location claim that does not map to rent, downtime, retention, CapEx, debt, or exit liquidity
  • gross MTM cited without probability-weighted renewal/replacement/vacancy math
  • single-tenant rollover treated like ordinary vacancy
  • 3PL WALT credited without testing underlying customer-contract durability
  • rent premium attributed to location when it is really building spec or tenant credit
  • cap-rate compression claimed after the same benefit is already modeled in rent growth or downtime
  • powered-land optionality without secured interconnection, energization schedule, tenant demand, fiber/cooling evidence, and entitlement path
  • IOS valued on gross acres instead of usable, entitled, improved acreage
  • cold-storage rent capitalized without refrigeration reserve and re-tenanting analysis
  • development thesis without preleasing, vacancy discipline, yield-on-cost spread, carry stress, and lease-up timing
  • exurban low-basis thesis that ignores supply elasticity and thin buyer pool
  • environmental, stormwater, roof, pavement, slab, or truck-court issues treated only as minor CapEx despite financing or exit implications
  • DCF works only with exit cap compression unsupported by current evidence
  • tenant credit analysis based on brand recognition rather than FCCR, liquidity, leverage, guaranty, sector health, and lease criticality

IC Exhibit Checklist

Required exhibits:

  • decision box and one-sentence thesis
  • deal snapshot and sources / uses
  • subtype comp set
  • tenant-universe table
  • location-to-model bridge
  • spec-to-value matrix
  • rent roll and rollover schedule
  • MTM probability tree
  • cap-rate reconciliation
  • replacement cost and cost-to-cure bridge
  • CapEx / environmental / insurance reserve schedule
  • debt sizing waterfall
  • return metrics and terminal-value share
  • sensitivity package and "what breaks first" summary
  • risk register with owner, trigger, mitigation, and approval condition
  • AM handoff checklist

AM Handoff

The IC memo should become the opening control document after close.

Handoff package:

  • frozen IC-approved model
  • assumption log and evidence grades
  • source support for rent roll, T12, leases, market rents, debt terms, CapEx, insurance, taxes, and environmental findings
  • opening budget bridge
  • capital budget and draw schedule
  • lender covenant and reserve calendar
  • leasing / renewal plan
  • risk register with owner, trigger, mitigation, and reporting cadence
  • first 30 / 60 / 90 day action list

Asset management should track original underwriting separately from current forecast. If actual leasing, CapEx, taxes, insurance, debt proceeds, or exit liquidity diverge from the memo, the variance should update both the asset plan and future acquisition standards.

Related Pages

Review Notes

  • 2026-06-15 review: promoted as an IC narrative methodology backed by reviewed industrial and investment-committee source material. Use as a decision-artifact structure, not as a substitute for deal-specific sponsor, tenant, debt, and market evidence.

Provenance

Created as an industrial-specific methodology synthesis from the general IC memo framework, acquisition-to-asset-management handoff guidance, sensitivity / return metric pages, legacy industrial materials, and the industrial underwriting methodology branch. It is a process and narrative framework, not a claim that all managers use one standardized IC template.