Market Role
Denver's data-center and powered-land branch compares city and suburban project contexts. The Parker report does not prove municipal restrictions caused its location or that suburban utility, entitlement, land-cost and operating conditions are superior. Treat these as project-specific hypotheses to test against actual records.
Source: CBRE Denver Data Center Market H1 2025 adds market-level benchmark context that was previously missing from this page. CBRE reported 20.1 MW across 27 online facilities in H1 2025 (market_observations.id=44032-44033) and said only two colocation facilities offered large amounts of power and space. Treat this as evidence of a small, selective market with facility-level scarcity, not as broad hyperscale capacity.
Market Metrics
| Metric | Value | Evidence |
|---|---|---|
| Active data-center capacity | 20.1 MW | CBRE H1 2025 source note / market_observations.id=44032 |
| Online facilities | 27 | CBRE H1 2025 source note / market_observations.id=44033 |
Confirmed Projects
| Project | Location | Confirmed facts | Real estate signal |
|---|---|---|---|
| Flexential Denver 5 | Parker / Douglas County | March report: $192M build budget, 249,000 SF, 22.5 MW capacity, reported rack-cooling scope; January 2027 target, not verified delivery | Project-specific colocation/service case; no verified suburban regulatory or utility advantage |
| Crusoe Spark Factory | Brighton / Adams County | March report: planned 352,000 SF manufacturing space; $200M-plus leasing/build-out/initial-fleet commitment; Q3 2026 module target, not verified delivery | Announced industrial supply-chain case; not data-hall MW or property price |
Boundary Conditions
This is an infrastructure and industrial-supply-chain lane, not proof of broad warehouse demand. Flexential is conventional digital-infrastructure real estate; Crusoe is manufacturing space for modular AI compute units. They support powered-land, utility-access, and AI-supply-chain underwriting, but they should not be collapsed into a generic Denver industrial demand call.
For the Crusoe case, use Industrial Location and Tenant Demand Underwriting for manufacturing tenancy and space demand, and Energy Infrastructure and CRE for factory-versus-deployment service boundaries. The bundled commitment does not price the real estate or establish operating compute supply. See Source: Crusoe Building $200M Denver-Area AI Factory.
For Parker, use Data Center Underwriting and Powered Land and Energy Infrastructure and CRE to verify the actual project budget/capacity boundary, service, water design, customer cash flows and approvals. The headline figures and cooling label are not a market-wide cost benchmark, measured water result or evidence that city restrictions caused the location. See Source: Flexential Building 249K SF Denver-Area Data Center in Parker, CO — $192M, 22.5 MW.
Portfolio Fit
The best-fit capital is specialized: powered land, digital infrastructure, and industrial investors who can evaluate utility access, water usage, entitlement, and manufacturing fit. CBRE now supplies a source-scoped active-capacity and facility-count benchmark, but market-wide vacancy, rent, leasing, and detailed power-availability tables remain gaps.
Demographic Snapshot
Proxy geography: Denver-Aurora-Centennial, CO Metro Area (cbsa 19740).
| Metric | Value |
|---|---|
| Population | 3002721 |
| Median household income | 105762 |
| Renter share of occupied housing | 35.9 |
| Poverty rate | 8.4 |
| Bachelor's degree or higher | 49.4 |
Proxy discipline: this ACS geography is public demographic context for underwriting, not a parcel boundary, broker submarket, airport catchment, data-center utility area, or retail trade area.
Economics and Demographics Value Lens
Demographic read: The CBSA proxy supplies regional workforce and municipal-quality context, with 3,002,721 residents, $105,762 median household income, low 8.4% poverty, and 49.4% bachelor's-plus attainment.
Demographic risk: Those demographics do not establish data-center demand, power availability, fiber, water, cooling feasibility, or customer commitments for any powered-land site.
Capital fit after demographics: Demographics confirm that the Denver region has a strong surrounding household and talent base, but capital fit remains specialized around utility delivery, entitlement, water use, and operator execution.
Related Pages
- Denver
- Denver AI Infrastructure Cluster 2026
- Brighton I-76 and E-470 AI Manufacturing Corridor
- Parker and Douglas County Data Center Corridor
- Powered Land and Grid Advantage
- Digital Infrastructure Real Estate
- National Digital Infrastructure Capital Deployment 2026
- Data Center Underwriting and Powered Land
Review Notes
- 2026-06-15 review: promoted as reviewed Denver data-center / powered-land coverage anchored to reviewed Denver market intelligence, Census support, and public Denver AI infrastructure source notes. Use as source-scoped powered-land and AI-infrastructure routing context; utility capacity, tariff treatment, water, entitlement status, site control, tenant-credit, transactions, lease economics, and asset-level claims still require local source notes, structured observations, utility records, entitlement records, lease records, or primary records before public/API or pro forma use.
Sources
- Denver AI Infrastructure Cluster 2026
- Denver Market Intelligence 2025
- Source: CBRE Denver Data Center Market H1 2025