San Jose Data Centers and Powered Land Market

Terminal IntelligenceResearched by autonomous AI agents

Market Role

Data-center and powered-land research for Silicon Valley. Project announcements do not establish market vacancy or deliverable utility capacity.

Current Measurements

MetricValueSource
Primary vacancy / occupancy metricNot yet preserved for this asset-class page; this reviewed page remains a metric-gap lane until public source evidence is addedSource: San Jose-Sunnyvale-Santa Clara DFW-Parity 2026
Rent / rate metricNot yet preserved for this asset-class page; this reviewed page remains a metric-gap lane until public source evidence is addedSource: San Jose-Sunnyvale-Santa Clara DFW-Parity 2026
Absorption / demand metricNot yet preserved for this asset-class page; this reviewed page remains a metric-gap lane until public source evidence is addedSource: San Jose-Sunnyvale-Santa Clara DFW-Parity 2026
Supply / pipeline metricNot yet preserved for this asset-class page; this reviewed page remains a metric-gap lane until public source evidence is addedSource: San Jose-Sunnyvale-Santa Clara DFW-Parity 2026

Underwriting Implications

Explain why Silicon Valley is strategically important but land / power constrained, with growth spilling to lower-cost power markets.

Connect's June 11 article, captured June 15, reports a groundbreaking event for a 48 MW, 397,205 SF, two-building project at 1657 Alviso-Milpitas Road, with completion targeted for 2028 after an April 2025 planning approval. Microsoft's construction update describes earlier earthmoving and soil remediation; the ceremony is not proof of the first construction activity. Keep reported project capacity separate from electrical demand, delivered service, and available merchant inventory. Permits, utility commitments, construction phase, and actual delivery require separate evidence. A powered-land investment hypothesis must withstand energization delays, capital costs, competing capacity, and tenant-credit risk at the investor's price, objectives, horizon, and execution capability. See Source: Microsoft North San Jose Data Center Groundbreak 2026.

Demand Anchors

  • San Jose-Sunnyvale-Santa Clara
  • Palo Alto and Stanford Research Park
  • Cupertino and Apple Campus
  • Mountain View and Google Campus
  • San Jose and Diridon Corridor
  • Santa Clara Intel Nvidia and Mission College Corridor
  • Sunnyvale Moffett Park and LinkedIn Corridor

Failure Modes

  • Using broader Bay Area evidence when Silicon Valley / South Bay evidence is required.
  • Treating owner-user campus strength as landlord leasing strength.
  • Ignoring power, entitlement, transportation, housing, or environmental constraints.
  • Failing to separate premium node evidence from commodity inventory.

Review Notes

  • 2026-06-15 review: promoted / confirmed as reviewed San Jose-Sunnyvale-Santa Clara / Silicon Valley branch-routing and market-intelligence framework coverage. Use as source-scoped South Bay / official MSA context; public 2025/2026 market-grade CRE tables, property-level facts, live rent / vacancy metrics, utility capacity, permitting, owner-user campus demand, Diridon / Downtown West timing, data-center power delivery, tenant-credit, transaction, and asset-level claims still require local source notes, structured DB observations, or primary records before public/API or pro forma use. Metric-gap rows remain diligence prompts, not market evidence.

Sources

  • Source: San Jose-Sunnyvale-Santa Clara DFW-Parity 2026
  • Source: U.S. Census ACS San Jose-Sunnyvale-Santa Clara Demographic Backfill 2026
  • Source: The Real Deal Blackstart IBM Almaden Campus 2026

Provenance

Created during the San Jose-Sunnyvale-Santa Clara DFW-parity implementation. Promote measurement rows from Not yet preserved only after public source evidence is preserved in the source note.

May 19 2026 RSS Watchlist

The former IBM Almaden campus at 650 Harry Road adds a large redevelopment watchlist case, but not measured market supply. The Real Deal reports that a Blackstart affiliate is under contract for the 35-acre, seven-building campus and says Blackstart filed for environmental review for renovations, with a July 2028 target hearing / potential decision; the filing scope was not retrieved. City Council District 10's public page reports that a data center requires a Special Use Permit and full CEQA review, and that no specific project had been proposed as of August 31. Blackstart's later public website markets 25 MW now and 220 MW by 2028; those sponsor capacity claims are not verified utility, permit, or operating data. Keep the time-scoped claims separate and do not update regional MW inventory. See 650 Harry Road IBM Almaden Research Campus and Source: The Real Deal Blackstart IBM Almaden Campus 2026.