The City's May 2026 monthly financial report adds a current municipal activity control to this pipeline. Through May 31, FY2026 year-to-date sales tax was $146.05 million versus $131.80 million in the prior-year period; business-license receipts were $52.28 million versus $50.23 million; and total licenses and permits were $54.90 million versus $52.74 million. The report also shows $11.89 million transferred to the capital-projects fund and $13.81 million to capital improvements year to date. These are citywide fiscal and public-investment signals, not permit counts, project awards, completed construction, or evidence of employment created.
The March 2026 Mobile investment prospectus adds a regional cross-check for named employment drivers. It reports $14.48 billion of area investment and presents Airbus's completed second A320neo line with 1,000 added Mobile-facility jobs, plus announced jobs tied to APM Terminals (88), ArcelorMittal Calvert (205), Austal USA (3,394), Evonik (10), Kimberly-Clark (29), Novelis in Baldwin County (1,000), and SSAB (12). The prospectus mixes Mobile, adjacent counties, completed, under-construction, and planned projects; retain the figures as source-defined pipeline controls, not a Mobile payroll total or a count additive to QCEW, employer headcounts, or contract records.
This page tracks announced economic-development and institutional capital context, not a complete delivered-project or permit database.
Mobile County's MS4 annual report adds a separate permit-and-inspection activity control for its April 2023-March 2024 reporting period: 31 land-disturbance permits, 387 residential and 41 commercial building permits, and 1,316 residential and 177 commercial inspections. The same table reports six completed county projects, three projects ready for construction, and written-violation counts. These are county program measures with different denominators; they are not delivered housing or commercial inventory, neighborhood absorption, occupancy, rents, or property performance.
The July 2026 Mobile Chamber releases add two current industrial-employer checkpoints. Power and Rubber Supply plans more than $7 million for a Salco Road facility, 55 jobs over five years, and spring 2027 operations after an expected August 2026 construction start. MYER Industries plans a $2.3 million Grand Bay facility at 12780 Saeger Road, 24 jobs over four years, and an August 2026 operating target; MYER Companies reports more than 200 teammates company-wide. These figures are announced investment, job targets, company-wide scale, and schedule evidence—not completed facilities, incremental local payroll, or population response.
Current Public Metrics
The City of Mobile's 2025 Public Works report records 16,566 permits processed, including 3,328 building permits and 3,363 electrical permits, and reports $1,222,353,231 of investment through the permitting process. This is a useful current citywide development-activity denominator for corridor and neighborhood follow-up, but it is not a count of completed projects, delivered units, occupancy, lease-up, employment, or population response. The approved structured control is market_import_city_mobile_public_works_permit_activity_2025.
The City's current GIS planning layers add a separate administrative-activity screen. Grouped 2024-2026 records include 9/11/5 Planning Commission approvals, 27/31/11 PUD applications, 119/97/62 subdivision applications, 19/17/20 zoning applications, and 7/10/9 sidewalk-waiver applications. These layer counts are useful for routing current neighborhood and corridor diligence, but they are not unique projects, building permits, construction starts, delivered units, or operating-market response. The structured control is market_import_city_mobile_gis_planning_activity_2026.
Permit Ledger's captured weekly aggregation of official City permit portals reports 886 permits for its latest displayed period ending August 9, 2026. Its displayed trade split is 230 electrical, 185 HVAC, 150 roofing, 104 plumbing, and 5 pool-and-spa permits; the shown weekly trend ranges from 177 for the August 3 week to 353 for the June 8 week. Treat this as a citywide normalized filing/repair activity control, not unique projects, delivered supply, neighborhood-level activity, occupancy, lease-up, or employment. The free page does not expose ZIP-level records. The structured control is market_import_permitledger_mobile_building_permits_weekly_2026.
The City reports Anchor Place as a planned 70-unit, three-story mixed-income workforce-housing community at 2350 Demotropolis Road, a $26 million development, and Mobile County's first Workforce Housing Tax Credit award. Construction is expected in early 2027 and leasing in summer 2028; treat both as announced targets.
The City's July 2026 environmental notice adds process-stage custody for Anchor Place: a Finding of No Significant Impact and intended request for $6,919,137 in CDBG-DR funds from ADECA. The notice does not establish release of funds, construction, completion, leasing, occupancy, or rents.
The City announced the March 2026 opening of Live Oak Trace, a 56-unit affordable senior-housing community at 6275 Overlook Road. Treat the reported opening and application availability as operating-stage evidence, not proof of lease-up or stabilized performance.
AHFA's 2026 funded-applications list adds New Spencer Crossings Mobile, a new 70-unit family construction project at 2350 Demetropolis Road. The list records $10.5 million in multifamily housing revenue bonds, $4.1 million in HOME funding, $509,440 in Workforce Housing Tax Credit, and $978,687 in tax credits. These are current financing and pipeline controls; the source says amounts may change pending final cost certification or placing in service and does not establish delivery, occupancy, rents, or operating performance.
The City's April 2026 Critical Repair Grant update adds a housing-rehabilitation route: the 2026 program focuses on roof replacements, adds $900,000 in discretionary funding, and targets more than 220 households. Treat those as program targets rather than completed repairs.
The City's HoPE page adds a separate affordable-infill and homeownership pipeline: a City-backed low-interest loan path for qualified housing-choice voucher holders and a stated plan for 50 to 75 new affordable single-family homes by the end of 2027. Treat this as a program target, not a site, construction, delivery, transfer, occupancy, or operating-market count.
The January 2026 Shelby Downtown Economic Development Revolving Loan Fund adds a $50 million low-interest financing route for eligible hotel, parking, higher-education/workforce, commercial, and mixed-use projects. Treat it as an available program, not evidence of funded projects or construction.
The City's April 2026 Animal Services update adds a proposed I-65-service-road civic-facility route with a 120-kennel program and a construction-contract proposal of approximately $6.3 million. Treat the route as contract-consideration evidence, not awarded construction or delivered capacity.
The City's November 2025 Campground HIP release adds a neighborhood-scale affordable-home pipeline: 30 homes across 30 blocks, with the first home at 1205 Basil Street and two additional homes reported complete at release. Treat the count as program-status evidence, not total delivery or neighborhood operating performance.
The City's April 2026 Berkshire Apartments bid notice adds a property-level municipal-enforcement route at 4021 Seabreeze Road N. Treat the securing-of-structures solicitation as a current public record, not evidence of award, completion, occupancy, rehabilitation, or redevelopment.
The Mobile Chamber reported $422.3 million in 2024 capital investment, 1,391 new jobs, 12 major projects, and an average wage of $58,814. Named examples included Austal's $288 million Final Assembly Building 2 and a 25,000-SF Frito-Lay distribution facility in Prichard. USA's 2024-2025 report separately records ongoing medical, research, and campus-capital projects. Mobile County's proposed 2026 PAYG program adds a proposed public-infrastructure pipeline: Michigan Avenue and Dauphin Street reconstruction, Azalea Road widening and a Montlimar Creek bridge, Zeigler Boulevard reconstruction, Halls Mill intersections, Semmes and Mobile street work, and municipal projects across the county.
The road program is best used as a route and construction-externality layer. It identifies project scope, programmed work, and in several cases estimated cost, but it does not establish delivered roadway capacity or downstream property performance.
Mobile County's July 2026 Bayou La Batre Streets bid notice adds a current coastal municipal procurement route under Project MCR-2024-301. Preserve it as bid-stage infrastructure evidence; the notice does not identify street segments, award, contract value, delivery, or access effects.
The City of Mobile reported four AHFA-approved city-backed developments in June 2025: Hurtel Crossing (56 units), Maryvale Village (56 senior units), Fred Marshall Court (50 units), and Providence Park (56 units). Together the awards represent 218 units and more than $81.7 million in total investment. The announcement reports city contributions of $1 million, $1 million, $10.5 million, and $7.5 million respectively, but does not provide stable parcel addresses or establish completion. Treat these as awarded funding and project-pipeline evidence, not delivered inventory.
MHA's FY2026-2030 plan adds a separate program-stage cross-check for Maryvale Place Mobile: 96 project-based vouchers were awarded to the development at 1901 Hurtel Street. MHA's current news index also carries an opening-soon PBV waitlist notice, but the linked notice retains an older date. Preserve the address, voucher award, and notice as bounded housing-program evidence rather than current completion, lease-up, occupancy, rent, or neighborhood absorption evidence.
The four projects are maintained as named routes: Hurtel Crossing Mobile, Maryvale Village Mobile, Fred Marshall Court Mobile, and Providence Park Mobile. Their individual pages preserve the same award-stage boundary and do not infer addresses, delivery, occupancy, affordability terms, or operating performance.
AHFA's November 2025 opening announcement adds Azalea Landing Mobile as a separate operating-stage affordable senior-housing route. It reports 56 units and a grand opening, along with source-specific funding and amenity details. The announcement does not provide a street address, current occupancy, lease-up, rents, or stabilized performance, so it should not be merged into the city's award-stage unit count or a metro-wide operating series.
AHFA's Cathedral Place spotlight adds Cathedral Place Mobile, a downtown 190-unit affordable senior- housing redevelopment for eligible residents aged 62 and older. It reports upgraded apartments and AHFA Housing Credit and bond support; preserve the project as financing and opening-stage evidence, not current occupancy, lease-up, rents, or stabilized performance.
AHFA's July 2025 bond-closing announcement adds Creel Road Apartments Mobile County, a financed 100-unit acquisition and new-construction project with a reported $28 million bond issue and more than $15 million of Housing Credit equity infusion. The project record does not provide an address, completion status, occupancy, rents, or stabilized performance; preserve it as financed pipeline evidence rather than delivered inventory.
The Mobile Airport Authority's March 2025 Aeroplex solicitation adds North Brookley Industrial Land Mobile as a raw-land development route. The Authority describes hundreds of acres, including a 272-acre parcel, for potential light-industrial, warehouse, aviation, and terminal-serving uses. The solicitation is not evidence of a selected partner, entitlement, construction, tenant commitment, or delivered inventory.
The Mobile Airport Authority's 2026 press-release index adds current airport access and terminal status context: a June 2026 Perimeter Road closure for construction of a new roundabout supporting the future terminal, a spring 2027 opening expectation, and reported $3 million in federal tarmac improvements funding. Preserve these as announcement-stage project evidence, not proof of completion, airport operations, passenger demand, or surrounding property effects.
The City's January 2026 Fred Marshall Court update upgrades that one route to dated construction evidence: a January 20 groundbreaking at 4350 Moffett Road for 50 units, with a reported $22 million investment and $10.5 million City contribution. It remains construction-stage evidence, not proof of completion or stabilized affordable-housing operations.
AHFA's companion January 2026 announcement adds the program frame: 55-and-older senior housing, cottage-style homes, a reported $980,840 award, and an estimated $8.4 million Housing Credit equity infusion. Preserve the City and AHFA figures as source-specific funding statements rather than reconciling them into one cost or treating either as delivered inventory.
The University of South Alabama's April 2026 capital-campaign announcement adds a $400 million institutional funding pipeline across USA Health, the Whiddon College of Medicine, marine and environmental sciences, student facilities, military-community facilities, and a planned College of Education and Professional Studies building. Treat the campaign as institutional capital-priority context; it does not establish delivered square footage, final project cost, or surrounding property performance.
The January 2026 USA construction update provides a separate dated project route for Frederick P. Whiddon College of Medicine Mobile: a 295,000-square-foot medical education and research facility under construction with a scheduled 2027 opening. Treat the reported size and schedule as project-update claims, not completed delivery or medical-office operating evidence.
The June 2026 Mobile County agenda adds Evonik Project MAL Mobile as an agreement-stage industrial pipeline route. Its amendment raises the stated capital-investment figure to $380 million and revises operations, investment, jobs, and reporting milestones; it does not establish realized investment, delivery, operations, or jobs.
Novelis Bay Minette Aluminum Facility is an adjacent Baldwin County project with direct Mobile labor-shed relevance. Novelis reports active construction, a second-half-2026 commissioning target, up to 1,000 expected jobs, and a current ten-role Bay Minette hiring board. Preserve it as a named regional driver, not as Mobile County delivered employment or population growth.
The Mobile Chamber's July 2026 industrial announcements add two project-stage routes: Power and Rubber Supply Facility Mobile County, a planned Mobile County facility reporting more than $7 million of investment and 55 projected jobs over five years, and MYER Industries 12780 Saeger Road Grand Bay, an acquired existing facility slated for $2.3 million of renovation/upgrades and 24 projected jobs over four years. These are announced economic-development projects; they do not establish delivery, realized investment, achieved jobs, current operations, or industrial-market performance.
The August 2026 Airbus announcement adds Airbus Central Distribution Center Mobile at 1501 Raven Drive, a planned Brookley Aeroplex distribution asset with a reported Q1 2027 operating target, combined Airbus Mobile investment above $82 million, and 50 projected jobs. Preserve these as company/project announcement claims; the source does not establish building delivery, final cost, current operations, or achieved employment.
The Mobile Chamber's Calvert announcement adds Jefferson Shredding Calvert Facility Mobile County, a co-location project at Outokumpu's Calvert facility with reported $22.4 million of investment and 15 new Mobile County jobs. Preserve these as announced project claims; the source does not establish delivery, facility size, realized investment, lease terms, occupancy, current operations, or achieved employment.
Eco Material Plant Barry Ash Harvesting Facility adds a named north-Mobile industrial project with a planned January 2026 in-service milestone. The project announcement describes approximately 600,000 dry tons per year of coal-ash-derived material and an approximately 25-person full-capacity operating team, separate from temporary construction labor. Treat the schedule and staffing as project parameters until completion, throughput, and filled employment are independently verified.
Beacon's June 2026 Calvert Infrastructure Hub profile adds Calvert Infrastructure Hub Mobile County, a planned data-center development with a reported 95-acre phase within a 650-acre parcel, a 2027 first-building target, and projected construction and operating employment. Preserve the developer's water, utility, employment, and schedule statements as project parameters and targets, not approvals, delivered capacity, tenant commitments, or achieved jobs.
Mobile Gateway Park adds a Creola/Mobile County industrial-site route: the public page presents 189 acres, 154 readily developable acres, rail and interstate access, and a master-developer opportunity with a proposed initial speculative building. Treat the page as current site-selection and development-stage evidence, not a funded project, construction record, tenant commitment, or delivered industrial inventory.
The SALP tenant follow-up adds two completed-opening routes to the project pipeline: the park operator reported that Simpson Strong-Tie and VEYER opened warehousing/logistics facilities in December 2024. The related local-officials announcement reports $17.3 million of combined investment and 34 announced jobs, including VEYER's planned port-supply-line rerouting. Treat the opening as operating-stage evidence, but retain the job figures as targets rather than current payroll.
Gulf Sterilization adds a smaller life-science project at 4345 Halls Mill Road. The Chamber reported $702,000 of investment and eight jobs over three years, while the company's current profile corroborates a Mobile contract-sterilization operation. The route does not establish completion of the announced improvements, current headcount, or realized employment.
The City's January 2026 Mobile Arena topping-out release adds a current downtown construction milestone for the former Civic Center site. Treat the reported $300 million cost, 22-acre site, schedule, amenities, and entertainment-district spillovers as project-update claims rather than delivered inventory or stabilized demand. The April 2026 City/Oak View Group naming-rights announcement now names the venue Regions Arena, reports a planned 10,000-seat capacity, and targets an early-2027 opening; it also identifies Regions Bank as the official banking partner for the arena, Convention Center, and Saenger Theater. These remain announcement-stage claims pending completion and operations.
Mobile County's April 2025 non-binding LOI for proposed Jubilee Park adds a Sportsplex-area sports, waterpark, hospitality, retail, dining, and lodging route. Treat its $60 million concept, program, visitor estimate, jobs, and site scale as proposal-level claims; the announcement does not establish approvals, financing, construction, or delivery.
The City's October 2024 River Walk Plaza sale-agreement release adds an early-stage downtown waterfront mixed-use concept with office, residential, hotel, retail, dining, and entertainment uses. Treat the concept and its then-aimed 2025 groundbreaking as dated project context, not current delivery evidence. Heron Landing Mobile adds a separate broker-listed south-Mobile waterfront residential-development route with explicit limits on delivery, lot sales, permits, absorption, and value.
Mobile County's current Sportsplex profile separates existing soccer capacity from a planned aquatics center and exploratory 25-acre public-private waterpark. Treat the reported $18 million to $21 million aquatics estimate and future-amenity language as County planning and funding context, not delivered capacity.
The County's Salt Aire profile adds an active coastal-restoration construction route: approximately 30 acres of marsh restoration and protection of 75 acres of remaining marsh near East Fowl River. River Delta Marina & Campground adds a separate $2 million State GOMESA grant for engineering, design, and planned visitor-access improvements. The Little Dauphin Island announcement adds approximately $13 million in federal and Gulf restoration grants for beach and dune habitat. These are public resilience and visitor-infrastructure projects, not private-market inventory or property-performance evidence.
The June 2026 Mobile County agenda adds a current engineering-action route for Project MCR-2018-007B, Airport Boulevard at Newman Road Intersection Improvements, with design and construction-engineering-inspection services assigned to Kimley-Horn. This is project-planning evidence, not proof of completed transportation capacity or surrounding property performance.
ALDOT's July 2026 project update adds Mobile River Bridge and Bayway Project as the regional Mobile River Bridge and Bayway route. It reports a revised approach positioning construction before the end of 2026, pending anticipated federal TIFIA approval, and a planned six-lane cable-stayed bridge with I-10 capacity and interchange, intersection, traffic-flow, and freight-mobility improvements across Mobile and Baldwin counties. This strengthens regional corridor and freight-routing context, but does not prove financing, construction start, completion, tolls, traffic change, induced demand, or property-market effects.
The July 2026 Riverside Cafe opening adds a delivered visitor-serving amenity at Escatawpa Hollow Park & Campground. The County reports approximately $10.1 million in park improvements to date and additional planned amenities; these remain public recreation and hospitality context rather than private-market operating evidence.
The June 2026 Cedar Point Boat Launch announcement adds a coastal-access construction route near Cedar Point Pier in Coden. The project is state-GOMESA funded and was announced as a roughly one-year construction effort; it remains project-status evidence rather than completed access or visitor-demand evidence.
The April 2026 Kali-Oka/College Parkway groundbreaking provides a dated construction milestone for the north Mobile County corridor; retain it separately from the earlier programmed-road source and do not infer delivered roadway capacity or downstream property performance.
The August 2026 Kali-Oka closure notice adds current construction-status and detour evidence for the Highway 158 intersection, including ongoing drainage work and weather-dependent timing. Treat the closure as a temporary access externality, not as proof of completed transportation improvement.
Mobile County's August 2026 Haskew Drive update adds Haskew Drive and McDonald Road Widening Mobile as a dated west-Mobile corridor route. It reports a completed connection into McDonald Road and reopening after temporary closure, but does not establish final roadway capacity, traffic effects, or surrounding property performance.
The Aquatic Center facility profile adds a separate Sportsplex-area public-recreation construction route with reported Phase I funding and scope. Treat the facility description as project and amenity context; current opening, operating performance, and Phase II delivery require independent verification.
The May 2026 Bayfront Park announcement adds a completed coastal public-realm route: approximately 900 feet of elevated boardwalk, two pavilions, and a half-mile ADA-accessible loop. Treat the reported completion and restoration funding as public-infrastructure evidence, not visitation or private-market performance.
The August 2026 County administration agenda adds a West Mobile County Park Expansion acquisition route for 7.5 Yorkhaven Road acres and a $280,000 CIP allocation, subject to subdivision approval. Treat it as a proposed public-land action rather than a closed acquisition or delivered park.
The July 2026 West Mobile County Park Expansion bid advertisement adds procurement-stage scope for an access road to Schillinger Road, restrooms, pavilions, a fenced dog park, landscaping, grading, and utilities. Treat it as planned public recreation infrastructure, not awarded or delivered capacity.
The July 2026 Potter Tract Road bridge advertisement adds a separate south-Mobile bridge-replacement procurement route. Preserve its 90-working-day allowance as bid-stage evidence without inferring award, delivery, access, resilience, or property-market effects.
The June 2026 Lott Road RRR bid tabulation adds an award-stage roadway route with a listed low bid of $1,094,867 and itemized pavement, striping, marker, traffic-control, and erosion-control work. Preserve the bid schedule as project evidence, not proof of contract execution, delivery, access, or property-market effects.
The June 4, 2026 County engineering agenda adds paired municipal award-stage routes: Satsuma Streets Resurfacing at a stated $159,000 low bid and Saraland Streets Resurfacing at a stated $531,449.69 low bid. Preserve the proposed-agenda boundary and do not infer street-level delivery or access effects.
The August 20, 2026 Mobile Planning Commission agenda adds a current city development screen with Cedar Crescent Drive Mobile Development Route, Halls Mill Mixed Use Subdivision Mobile, and MAEF Center for Advanced Careers Bel Air Mall Subdivision Mobile. It also records subdivision, sidewalk-waiver, university-park, and mobile-home-community actions across Moffett Road, Dauphin Island Parkway, University Boulevard, Griffith Circle, and Halls Mill Road. These are administrative filings and agenda-stage requests, not delivered residential, mixed-use, education, retail, access, or operating-market inventory.
The July 16, 2026 results agenda upgrades selected routes to decision-stage evidence: Cloverleaf Plaza Unit One Mobile received a subdivision-extension approval; Rogers Group Subdivision Mobile, The Residences at Oakleigh Phase Two Mobile, 90-65 Commercial Park Mobile, and Moffett-Bear Fork Subdivision Mobile received subdivision or planning actions; and Mobile Infirmary Emergency Room Expansion Route received a hospital PUD-modification action. Preserve the specific approval, tentative-approval, recommendation, and condition language; none establishes recorded plats, permits, construction, delivery, occupancy, or operating performance.
The same agenda records a stated $137,000 low-bid award for Fiber Road Railroad Crossing Improvements. Preserve it as award-stage infrastructure evidence without inferring crossing scope, execution, safety, or access outcomes.
The agenda also authorized advertising for Monroe Lane and Monroe Lane North GDBP. Preserve this as a bid-authorization route, not an award, contract, delivery, access, or property-performance claim.
Murray Road GDBP adds a bid-to-contract-stage route: the County's bid advertisement allowed 60 working days, and its July 28 agenda records a drainage-work amendment decreasing the contract by $5,212.34. Preserve the project-stage record without inferring completion or drainage performance.
The July 28, 2026 County agenda adds three current project routes: a $270,795 CIP amendment and design action for the Cypress Creek Golf Course clubhouse, a pending-legal-review $100,000 theater renovation contract for Azalea City Center for the Arts on Springdale Boulevard, and an approved industrial-access sponsorship and State construction agreement benefiting Superior Air Parts at Radcliff Road and Johnson Road. These improve public-project and industrial-access routing but do not establish delivery, capacity, employment, attendance, or surrounding property performance.
The same agenda records a $44,142.66 change order for the Dave Patton House renovation and three approved proposed/final plats: Whitmer Acres, Second Addition (four lots on Natchez Highway), Helms Estates (three lots at Rester Road and Skyline Road), and Poiroux-Turner Subdivision (two lots on Old Pascagoula Road). These are project and subdivision-stage signals, not a complete development inventory or proof of buildout.
The Mobile Chamber's Prism Systems announcement adds a downtown office-buildout and employer route at 857 Dauphin Street. Treat the $6.4 million investment, 52 new positions, 44 retained jobs, and scheduled transition as announcement-level claims rather than delivered office inventory or realized employment.
The Alabama Port Authority's current careers page adds operating-stage workforce evidence to the port investment route. It reports more than 500 Authority employees and current Mobile openings in docks labor, facilities engineering, and economic development. The economic-development position is explicitly tied to future cargo, Port-owned industrial properties, and job creation. Preserve this as direct Authority employment and recruitment evidence; it does not establish tenant payroll, contractor capture, or a population multiplier.
The Port Authority's June 2026 federal-funding update adds a current infrastructure-investment control: more than $49 million in FY2026 federal funding and appropriations for dredging, beneficial use, rail-yard improvements, McDuffie Coal Terminal modernization, future cargo-facility design, and sedimentation study. The Port's statement that it supports more than one in seven jobs statewide is kept as statewide economic-impact context, not Mobile payroll, contractor employment, or population causation.
Prism's current official site provides operating-stage corroboration: it identifies a Mobile headquarters at 853 Dauphin Street and active automation, embedded-systems, networking, production/assembly, and software-engineering functions. The address mismatch and absence of current headcount or occupancy evidence remain explicit project follow-up items.
The Chamber's February 2026 GDP release adds a current county macroeconomic context lane: it reports $24.3 billion of 2024 real GDP and approximately $2.046 billion of real-GDP growth from 2022 to 2024. Preserve the county and federal-data boundaries; these figures do not substitute for CRE operating metrics or property-level demand.
The Chamber's 2026 outlook identifies affordable housing, childcare, transportation, talent, education, industry recruitment, and infrastructure as workforce and growth constraints or priorities. It also reports MYER Companies' planned 36,000-square-foot manufacturing expansion and 50–60 positions; preserve the employer-specific boundary and do not convert it into regional inventory or realized employment.
The City's 2026-2030 Capital Improvement Plan provides the current citywide capital-program frame: $172.4 million of currently identified 2026-2030 funding across transportation, parks and greenways, environment, city facilities, contingency, and special programs. It identifies route context for Broad Street/MLK, Three Mile Creek, waterfront access, Airport Boulevard, Dauphin Street, Zeigler Boulevard, and Michigan Avenue. These are plan and funding signals, not delivered project, traffic, property-value, or private-market performance evidence.
The St. Louis Street project page adds a current downtown execution route: 17 blocks from Water Street to Broad Street are under construction, with a stated $16.8 million contracted cost, full funding, and a first-quarter 2028 target. Preserve block closures and construction timing as current-access context, not delivered downtown demand or property performance.
Mobile County's Civil Rights and Cultural Heritage District plan adds a heritage-investment and implementation route along “The Avenue”/MLK, with the Historic Franklin House & Gallery, Historic Avenue Cultural Center, and Dave Patton House renovation identified as anchors or early work. Restore Mobile's Marine Street Cottages add a separate Oakdale affordable-infill route: three homes were unveiled in May 2025 within a seven-home ARPA-funded program. Keep both as civic and neighborhood-project context, not delivered tourism, housing inventory, or private-market evidence.
The June 2026 County agenda adds an awarded CRCHD-001 stabilization and renovation route for the Crawford Law Firm and MAMGA Legacy Center. Preserve the stated $1,282,253 low-bid award and $782,253 capital-plan allocation as public-project evidence; completion and operating outcomes are not established.
Saraland's 2026 Capital Projects resurfacing notice adds a north-Mobile municipal roadway procurement route. It identifies roadway resurfacing, traffic-striping replacement, and raised pavement markers, but not the sites, award, cost, mileage, or delivery status.
ADEM's revised 2025 Voluntary Cleanup Plan adds the Saraland Sports & Recreation Complex as a named public-facility and environmental-remediation route. Preserve the reported 117-acre facility, planned amenities, and $72 million municipal-bond figure as dated plan evidence, not delivered recreation inventory, realized tourism, or operating performance.
The Satsuma Planning Board and Chickasaw Comprehensive Plan add municipal planning evidence along the north-Mobile route. Satsuma's current board process covers subdivision plats, site plans, rezoning, and comprehensive planning; Chickasaw's dated plan preserves land-use, infrastructure, and post-industrial context without serving as current inventory or performance data.
Mobile County's unincorporated development page, Creola's published planning forms, and Citronelle's building department add current jurisdiction and permitting routes across the wider county. These establish diligence entry points, not project inventory, delivery, or market performance.
The County subdivision process adds a source-defined entitlement pathway, while Creola City Park Improvements adds a bid-stage public-recreation project. Preserve both as diligence routes rather than delivered housing or recreation inventory.
Creola's subsequent GOMESA notice records an intended grant-award meeting for the park project. Treat it as a project-finance stage signal, not proof of award, disbursement, construction, or operating recreation demand.
Creola's Bentley Road/Sailor Road notice adds an entitlement-stage residential subdivision route for approximately 74.94 acres and 10 proposed lots. Preserve it as an application signal, not approved or delivered housing inventory.
Creola's proposed zoning-amendment summary adds a land-use policy route touching residential, storage, entertainment, and data-center categories. Treat it as proposed regulation, not evidence of approved use, capacity, or delivered projects.
Underwriting Use
Use Mobile Project Stage Evidence Crosswalk 2026 to preserve the distinction between program, announcement, award, bid, construction, and operating-stage evidence.
Use announced investment and institutional construction as demand-anchor and project-screen context. Do not convert announced investment into delivered industrial, office, healthcare, or housing inventory. Verify approvals, funding, construction stage, employment realization, utility requirements, environmental conditions, and site-specific market capture.
Related Pages
- Mobile, AL
- Mobile, AL Investment Hub
- Mobile Industrial and Logistics Market
- Mobile Healthcare and Higher Education Market
- Mobile Labor Market and Employment Anchors
- Port of Mobile and Brookley Aeroplex
- Airbus Mobile Second A320 Final Assembly Line
- Airbus Central Distribution Center Mobile
- Austal USA Mobile Expansion
- Mobile Arena
- Jubilee Park Waterpark
- River Walk Plaza Mobile
- Mobile County Sportsplex
- Salt Aire Shoreline Restoration Project
- River Delta Marina and Campground Improvements
- Azalea Road and Montlimar Creek Corridor
- Zeigler Boulevard and North Mobile Corridor
- Zeigler Boulevard Reconstruction Mobile
- Michigan Avenue and Dauphin Street Reconstruction
- South Mobile and Coastal County Road Program
- Little Dauphin Island Restoration
- Airport Boulevard at Newman Road Intersection Improvements
- Escatawpa Hollow Park and Riverside Cafe
- Cedar Point Boat Launch
- Mobile County Aquatic Center
- Bayfront Park Boardwalk
- West Mobile County Park Expansion
- Cypress Creek Golf Course Clubhouse Mobile
- Azalea City Center for the Arts Mobile
- Superior Air Parts Radcliff Road Access Project Mobile
- Dave Patton House Mobile
- Source: Mobile County West Mobile County Park Expansion Bid Advertisement
- Source: Mobile County Potter Tract Road Bridge Replacement Bid Advertisement
- Source: Mobile County Lott Road Resurfacing Restoration Rehabilitation Bid Tabulation
- Source: Mobile County Satsuma and Saraland Streets Resurfacing Awards
- Source: Mobile County Fiber Road Railroad Crossing Improvements Award
- Source: Mobile County Monroe Lane and Monroe Lane North Bid Authorization
- Source: Mobile County Murray Road Grade Drain Base Pave Bid Advertisement
- Source: Mobile County Murray Road Contract Amendment Agenda Record
- Anchor Place Mobile
- Live Oak Trace Mobile
- Azalea Road Widening and Montlimar Creek Bridge Mobile
- Michigan Avenue Reconstruction Mobile
- Dauphin Street Reconstruction Mobile
- 618 Summerland Drive Mobile
- Source: City of Mobile Affordable Homes RFQ 2026
- North McGregor Avenue Reconstruction Mobile
- Source: City of Mobile Public Works Annual Report 2025 Draft
- Source: Alabama Port Authority Mobile Careers 2026
- Source: Betbeze Heron Landing Mobile Waterfront Development Listing 2026
- Source: City of Saraland 2026 Capital Projects Resurfacing RFP
- Source: ADEM Saraland Sports and Recreation Complex Voluntary Cleanup Plan
- Source: City of Satsuma Planning Board
- Source: City of Chickasaw Comprehensive Plan 2030
- Prichard Municipality
- Source: Mobile County Development and Zoning
- Source: City of Creola Permits, Forms, and Planning Applications
- Source: City of Citronelle Building and Zoning Department
- Source: Mobile County Subdivision Process and Regulations
- Source: City of Creola City Park Improvements Advertisement for Bids
- Source: City of Creola GOMESA Grant for Creola Park Improvements
- Source: City of Creola Bentley Road and Sailor Road Major Subdivision Application
- Source: City of Creola Zoning Amendment Ordinance 2023 Notice
- Downtown Mobile Wayfinding Program
- South McGregor Avenue Reconstruction Mobile
PAYG approval boundary
The retained 2026 PAYG report proposes these projects. Its funding depends on the November 3, 2026 referendum. As of October 9, 2026, this source does not establish voter approval, an appropriation, construction, or delivery. Keep separate City, state, federal, and prior-program funding or completed work under their own evidence.
Sources
- Source: Mobile Chamber Economic Development Numbers 2024
- Source: Simpson Strong-Tie and VEYER SALP Announcement 2024
- Source: Simpson Strong-Tie and VEYER Open at SALP
- Source: Mobile Chamber Gulf Sterilization Mobile Facility
- Source: Gulf Sterilization Mobile Operating Profile
- Source: Eco Material Technologies and Alabama Power Plant Barry Ash Harvesting
- Source: University of South Alabama President Report 2024-2025
- Source: Mobile County FY2026 Pay-As-You-Go Road Program
- Source: Mobile County City of Bayou La Batre Streets Bid MCR-2024-301
- Source: Mobile County Crawford Law Firm and MAMGA Legacy Center Stabilization Award
- Source: City of Mobile Affordable Housing Developments 2025
- Source: AHFA Azalea Landing Mobile Opening 2025
- Source: AHFA Creel Road Apartments Mobile County 2025
- Source: AHFA New Spencer Crossings Mobile 2026
- Source: Mobile Aeroplex North Brookley Real Estate IFB 2025
- Source: University of South Alabama Where Bold Begins Capital Campaign 2026
- Source: Mobile Arena Topping Out 2026
- Source: Mobile Arena Regions Naming Rights 2026
- Source: Mobile County Jubilee Park Waterpark LOI 2025
- Source: City of Mobile Anchor Place Workforce Housing
- Source: City of Mobile Anchor Place Environmental Release 2026
- Source: City of Mobile Live Oak Trace Opening
- Source: City of Mobile Critical Repair Grant Expansion 2026
- Source: City of Mobile Shelby Downtown Economic Development Loan Fund
- Source: City of Mobile Animal Services Facility Moving Forward
- Source: City of Mobile Campground Housing Improvement Program
- Source: City of Mobile Berkshire Apartments Securing Bid
- Source: City of Mobile Critical Repair 618 Summerland Drive
- Source: Mobile River Walk Plaza Sale Agreement 2024
- Source: Mobile County Sportsplex Facility Profile 2026
- Source: Mobile County Salt Aire Shoreline Restoration 2026
- Source: Mobile County River Delta Marina Campground Improvements 2026
- Source: Mobile Prism Systems Downtown Headquarters 2025
- Source: Prism Systems Mobile Operating Employer 2026
- Source: Mobile County GDP Growth 2024 Release 2026
- Source: Mobile Chamber 2026 Economic Outlook 2025
- Source: Airbus Central Distribution Center Mobile 2026
- Source: Mobile County Kali Oka College Parkway Groundbreaking 2026
- Source: City of Mobile Capital Improvement Plan 2026-2030
- Source: City of Mobile Zeigler Boulevard Expansion Completion
- Source: City of Mobile St. Louis Street Complete Streets Project 2026
- Source: ALDOT Mobile River Bridge and Bayway Project Advances 2026
- Source: City of Mobile Public Works Annual Report 2025 Draft