Theodore/Dawes is a distinct source-defined industrial-growth route. South Alabama Logistics Park Mobile preserves Mobile County's 2021 announcement of a 1,300-acre park concept and more than 6 million square feet planned in Phase I; that announcement is not evidence of delivered industrial inventory or current tenant demand.
This is the industrial and logistics lane inside Mobile, AL. Colliers' market geography includes Mobile submarkets and Daphne-Fairhope-Foley; preserve those boundaries rather than treating every row as strict CBSA 33660 performance.
The Mobile Airport Authority's March 2025 Aeroplex real-estate solicitation adds portfolio-scale context for the Brookley industrial node. It describes approximately 6 million square feet of developed space across more than 70 tenants and around 3,600 employees, plus hundreds of acres of North Brookley raw land, including a 272-acre parcel, positioned for potential light-industrial, warehouse, aviation, and terminal-serving uses. The record is an authority solicitation and development-positioning source; it does not establish a complete inventory, current occupancy, tenant-level performance, or delivery of the proposed raw-land program.
The Authority's current infrastructure page adds a separate physical-capacity control: CSX directly serves approximately 500,000 square feet of Aeroplex buildings; the site has two direct I-10 interchanges and two additional ramps; and the Authority describes 41 berths and 400-ton barge-mounted lift capacity adjacent to the Port of Mobile. These facts strengthen the Brookley industrial/logistics route, but they are not a complete inventory denominator, current throughput, executed lease, tenant, occupancy, or employment measure. Keep the 500,000-square-foot directly served area separate from the broader 6-million-square-foot developed-space description until the two authority-defined scopes are reconciled.
The Alabama Port Authority's current careers page adds a direct operating-employer signal inside the port node: the Authority reports more than 500 employees across skilled trades, engineering, project management, operations, administration, and business development. Current Mobile listings include dock labor, facilities engineering, and economic-development roles. The page's economic- development role explicitly connects port-owned industrial property, future cargo, and job creation, but the Authority workforce should not be mistaken for total port-dependent employment or tenant payroll.
Bender CCP adds a new specialized maritime entrant at Bender CCP Mobile. The March 2026 Chamber announcement and FOX10 reproduction describe a planned 22,000-square-foot machine shop at 5502 Todd Acres Drive in Mobile Commerce Park, a $4.1 million investment, and a plan for 10 employees by the end of 2026. The announced service mix includes propulsion-shaft machining for U.S. Navy vessels and commercial maritime operations. This is a concrete new-employer and defense-support pipeline, but the 10 employees remain a target and the sources do not establish facility completion, a disclosed federal award, current payroll, or industrial absorption.
Current Public Metrics
Colliers' Q4 2025 Mobile industrial report reported 52.8 million SF of inventory, 6.1% overall vacancy, negative 644,314 SF of trailing-four-quarter net absorption, $8.68/SF overall asking rent, 250,000 SF delivered over the past year, 515,000 SF under construction, and $139 million in sales over the past year. The report's submarket table shows materially different vacancy and absorption conditions across CBD, Midtown, Northeast Mobile, Outlying Mobile County, Prichard/Saraland, West Mobile, and Daphne-Fairhope-Foley.
The approved structured package market_import_colliers_mobile_industrial_q4_2025 binds the Colliers total and seven provider-defined submarket rows to 41 Q4 2025 observations covering inventory, available space, vacancy, net absorption, gross asking rent, and total-market construction. These rows remain provider-defined and are not strict CBSA 33660 or corridor-level operating data.
Gulf Coast Property Group's May 2026 CRE Pulse adds a separate CoStar-labeled cross-asset screen: 6.8% industrial vacancy, negative 883,000 SF of 12-month absorption, and $0.71/SF asking rent. The public chart does not publish inventory or submarket boundaries, so these figures remain a cross-provider check rather than a replacement for Colliers' provider-defined industrial table.
Alabama Commerce's FY2026 announcement report adds an employer and employment-driver cross-check: 16 Mobile-area new/expanding projects reported 553 jobs and $2.417 billion of capital investment. The named projects include ArcelorMittal Calvert steel, Kimberly-Clark, Master Boat Builders in Coden, Dynasty Fab Chickasaw Marine Terminal, APM Terminals, and other manufacturing, port, aerospace, and software employers. Austal's separate T-ATS announcement confirms a specific Navy-linked supplier contract for Master Boat. A separate defense-trade report identifies a $9.516 million Navy ship- repair work package performed at Alabama Shipyard in Mobile in September–October 2025. The official DoD record adds a $18.734 million USNS Mercy availability in Mobile and a $536.750 million Ex-Enterprise dismantling contract with Mobile work expected through November 2029. Preserve these sources as employer and project-pipeline evidence; do not convert announced jobs or contract activity into delivered industrial demand without follow-up.
Dynasty Fab adds a named north-Mobile industrial entrant to that pipeline. The company announced a Chickasaw Marine Terminal operation with $2 million of capital improvements and 30 initial jobs, and independent trade coverage describes dock access and large-component fabrication for defense, aerospace, automotive, and maritime customers. The route strengthens the Port of Chickasaw's supplier and advanced-manufacturing map, but the sources do not establish completed buildout, current occupancy, filled jobs, or production volume.
SSAB's Axis facility is a complementary incumbent steel-capacity route. The company and Mobile Chamber describe an approximately $74 million heat-treat expansion with a new building, tempering furnace, infrastructure improvements, and increased truck-shipping capacity. The project carried a 12-job target and a 2025--2027 schedule, but the captured sources do not establish delivered inventory, completion, operating performance, or filled employment.
Canfor's Axis Sawmill is now an operating-stage north-Mobile industrial anchor rather than only a state announcement. Canfor reports a late-2024 opening, 100 million board feet of added regional capacity, and 130 employees in February 2025; its current locations directory displays 153+ at the Axis site. Preserve the discrepancy as dated source-defined scale evidence. The sawmill strengthens the lumber/manufacturing and freight map, but does not establish a contract-driven demand wave or market-wide industrial performance.
Novelis Bay Minette Aluminum Facility adds a major adjacent Baldwin County industrial and labor- shed route. Novelis reports a more-than-$4 billion recycling and rolling plant, up to 1,000 expected jobs, active construction, and a second-half-2026 commissioning target. Its official Bay Minette board lists ten roles across engineering, supervision, maintenance, automation, laboratory, and industrial electrical work. This is active project and hiring evidence, but it is not Mobile County employment or proof that the job target, commissioning, or population response has been realized.
Gulf Distributing's downtown route adds beverage distribution and adaptive reuse to the logistics map. The 2024 release describes the former Press Register building as a 243,000-square-foot warehouse/office facility with 257 relocated Mobile employees and 65 planned new jobs, while Gulf's current site confirms a Mobile operating address and three-state distribution platform. Project figures remain subject to realization follow-up and do not replace Colliers' delivered inventory screen.
The named 2025 projects show three different industrial-demand mechanisms: Primo OneSubsea Mobile Facility's new 24,000-SF co-located PVC-profile facility at SLB OneSubsea, Kimberly-Clark's future production-line expansion, and ArcelorMittal Calvert Steel Facility Mobile's electrical-steel project. Kimberly-Clark Mobile Manufacturing Expansion is a separate incumbent expansion. The ArcelorMittal announcement is particularly useful for underwriting because it separates up to 1,300 construction jobs from more than 200 permanent operating positions. These are employment-driver routes, not additions to Colliers' delivered inventory or proof of current tenant demand.
Primo's March 2026 company update moves the named supplier route from announcement to operating stage: the 24,000-square-foot Mobile extrusion facility is reported complete and formally producing PVC profiles for subsea cables in connection with SLB OneSubsea. It is useful operating-capacity evidence, but the release does not establish current headcount, filled jobs, throughput, absorption, or realization of the announced 12 regional jobs.
BendPak's August 2026 first-party release adds another operating-stage employer and logistics route: BendPak Donald R. Henthorn Industrial Complex Mobile is a Phase 1 of its 33-acre Donald R. Henthorn Industrial Complex is complete, including a 261,600-square- foot logistics and distribution center near the company's existing East Coast campus. The facility functions include distribution, warehousing, quality control, sales and service, showroom, training, and special events, with later phases planned. This substantiates a current industrial footprint and new/expanding operating capacity, but BendPak does not disclose Mobile headcount, payroll, filled jobs, local-hire share, throughput, or population response.
ADEM's public notice provides a project-stage check on Kimberly-Clark's expansion: the Mobile mill sought authorization to construct and operate a foam-laid manufacturing line, with the agency's review indicating the proposed equipment and operations should meet air requirements. The notice does not establish final permitting, completion, operating status, or incremental industrial demand.
Austal's official Mobile facility profile reports more than 3,000 employees and 1.5 million square feet of indoor manufacturing space. Treat this as a named-employer operating-footprint anchor, separate from the Colliers industrial market denominator and from project-announcement job counts. Alabama Shipyard's current first-party facility profile reports that the company grew from eight full-time employees at its 2019 launch to more than 300 and serves commercial and government markets from its 356-acre Pinto Island facility. Preserve this as company-reported operating scale tied to a named Navy-work recipient, not as award-specific hiring, local payroll, or population response.
Source: Seapower Reprint of Navy Alabama Shipyard Submarine Industrial Base Jobs 2024 preserves the Navy-attributed September 2024 expectation of approximately 3,000 new sustainable jobs at the Mobile Alabama Shipyard project while preserving existing employment. This is a forward project target, not a current site headcount or realized contract-employment total; it must remain separate from the facility's reported more-than-300 workforce and from county QCEW employment.
The Navy Submarine Industrial Base Program adds a primary workload control to this defense-industrial route. Its current Supply Chain page ties the United Submarine Alliance Fund's acquisition of the 355-acre Alabama Shipyard in Mobile to dedicated submarine-manufacturing capacity and reports 3.8 million manufacturing manhours in 2025, with more than 4 million fabrication manhours planned for 2026 outsourcing. These are program-workload and capacity measures, not Alabama Shipyard headcount, local payroll, or evidence of population response; keep them separate from the Navy's approximately 3,000-job project expectation.
SALP's current public tenant profile adds named operating-demand routes for Office Depot, Averitt, Simpson Strong-Tie, Chadwell Supply, VEYER, and DC Safety. The operator's October 2025 announcement confirms the public Simpson Strong-Tie and VEYER location announcement. These facts add tenant navigation inside the Theodore/Dawes logistics platform, but do not establish lease economics, building-level occupancy, or park-wide inventory.
The 2024 local-officials announcement reports $7.5 million and 16 announced jobs for Simpson Strong-Tie and $9.8 million and 18 announced jobs for VEYER; the SALP operator's December 2024 update says both warehousing/logistics facilities had opened. This upgrades the two routes from location profiles to operating-stage corroboration while keeping the job figures as announcement targets.
Gulf Sterilization adds a smaller life-science industrial route at 4345 Halls Mill Road. The Chamber announced $702,000 of investment and eight jobs over three years, while the current company profile describes a Mobile contract-sterilization operation using chlorine dioxide and an ISO 13485 quality system. Neither source supplies current headcount, filled jobs, facility completion, or throughput.
The provider rows are routed separately through Daphne-Fairhope-Foley Industrial Submarket, CBD Industrial Submarket, Midtown Industrial Submarket, Northeast Mobile Industrial Submarket, Outlying Mobile County Industrial Submarket, Prichard and Saraland Industrial Submarket, and West Mobile Industrial Submarket.
MyStateMLS adds 3107 Spring Hill Avenue Mobile as a small mixed commercial/warehouse closed-sale control. The Tranzon Driggers record reports a November 20, 2025 sale at $192,500 on approximately 0.72 acres, with retail/warehouse space and four roll-up doors. Its marketing description says 9,247 square feet while the property-details section reports 3,604 square feet; preserve that conflict and verify it against county records. The record adds transaction depth around the Spring Hill/Midtown corridor but is not a pure industrial comp, executed lease, tenant/occupancy record, or marketwide industrial price indicator.
Mobile Gateway Park adds a current Creola/Mobile County site-selection route: the public page reports a 189-acre rail-served site with 154 readily developable acres, a stated $50,000-per-acre price, connections to five Class I railroads and 11 railroads total, and proximity to I-65, I-10, and the Port of Mobile. It describes a master-developer opportunity with a proposed initial speculative building of at least 200,000 square feet. These are marketed site and development-stage claims, not executed land pricing, delivered inventory, tenant commitments, or industrial operating metrics.
Port and Supply Read
Colliers identifies the Port of Mobile as the long-term demand anchor, while the City of Mobile recovery plan separately supports port, manufacturing, logistics, infrastructure, and resilience routing. The current market read is therefore two-sided: port-driven long-term competitiveness with near-term move-out and absorption softness. Underwriting must distinguish port/industrial strategy from current leasing performance.
The port project stack now includes the completed 50-foot Mobile Harbor Modernization milestone, the ongoing Pier B South general-cargo modernization, Austal's submarine-module and surface-ship production expansion, and the APM Terminals Mobile Intermodal Rail Facility ICTF expansion. The APM release reports two new 3,000-foot working tracks and two rail-mounted gantry cranes in a $58.6 million project expected to complete by the end of 2026. These strengthen the source-backed industrial anchor map. The same release reports eight new direct jobs and 359 retained positions; those are project-period creation and retention claims, not current payroll or tenant-wide port employment. None substitutes for current leasing, delivered inventory, tenant, or property-level evidence.
APM Terminals' October 2025 Phase V announcement adds a larger port-capacity and public-funding checkpoint: a planned 1,300-foot berth, $131 million project funded through federal appropriations and private investment, a reported 50% berth-capacity increase, more than $200 million in related terminal/rail investments underway, and a 20-year concession extension. This supports a durable logistics-capacity and infrastructure-driver hypothesis, not permanent employment, cargo throughput, population, or CRE absorption.
The Port Authority's June 2026 federal-funding announcement adds a current public-investment layer: more than $49 million in FY2026 federal funding and appropriations for dredging and beneficial-use initiatives, TASD Interchange Yard, McDuffie Coal Terminal, future cargo-facility design, and a sedimentation study. This strengthens the port-capacity and government-enabled infrastructure route, but does not identify local payroll, contractor capture, throughput response, or population/CRE impact.
The federal-contract lane is also concrete but bounded. HigherGov's record for Mobile Harbor Phase 6 identifies The Dutra Group's W91278-24-C-0027 award, announced at $75,357,737, with work performed in Irvington, Alabama. It confirms a public infrastructure work package associated with Mobile Harbor; it does not disclose local headcount or establish a permanent employment, population, throughput, or industrial-absorption effect. The primary DoD page is retained as blocked no-claim evidence because the local capture returned HTTP 403.
ArcelorMittal Calvert's official careers profile adds operating-employer depth for the north-Mobile County industrial labor shed: 1,600 reported employees at a steel complex with river-terminal, rail, rolling, galvanizing, and supporting infrastructure, plus active 2026 capital-project and maintenance roles. This is employer-footprint and hiring-signal evidence, not a replacement for Colliers' market series or a measure of realized expansion jobs.
The Mobile Chamber's May 2026 Austal update adds a dated production-stage cross-check: the company celebrated the April 27 start of construction on LCU 1714, its fifth U.S. Navy LCU 1700-class vessel, at the Mobile shipyard. Treat this as a named shipbuilding milestone that complements the existing facility-expansion route; it does not establish completion, throughput, workforce, supplier demand, lease economics, or industrial-market absorption.
Right Space Commercial's May 2026 activity report adds two bounded broker-reported leasing routes: approximately 5,000 square feet across suites A and C at 2565 Government Boulevard, and approximately 4,000 square feet across suites B-1 and B-2 at Halls Mill Industrial Park. The descriptions support warehouse/flex property diligence around roll-up access, office components, and ceiling heights, but do not establish executed terms, tenants, achieved rents, occupancy, absorption, or industrial-market performance.
CRE Mobile's featured-listing screen adds named industrial/logistics routes at 250 Jacintoport Boulevard and 6420 Wall Street, plus an office/warehouse route at 840 Lakeside Drive described at 38,000 square feet. These are current broker-navigation screens, not verified availability, tenant, rent, occupancy, or industrial-market performance.
Evonik Project MAL Mobile adds a June 2026 Mobile County agreement-amendment route: the agenda raises the stated capital-investment figure from $176.462 million to $380 million and revises operations, investment, jobs, and reporting milestones. This is industrial-project pipeline context, not evidence of delivered square footage, realized investment, current operations, or achieved jobs.
Evonik's April 2026 operating release provides the current employer counterpart: the Theodore campus reports approximately 750 employees and more than 250 resident contractors across a 28-plant manufacturing complex. Preserve this operating scale separately from Project MAL's agreement-stage investment and job milestones.
Evonik Theodore Manufacturing Complex Mobile County is the named-asset route for that operating campus. It supports industrial employer and contractor scale, while keeping the amended Project MAL investment and employment milestones in the forward pipeline until delivery and realized hiring are independently documented.
Mobile Aerospace Engineering Brookley MRO adds a separate aerospace-employment balance: a dated 579-worker baseline and 200-job expansion target followed by ST Engineering's reported transition of the Mobile airframe-MRO operation toward Pensacola and San Antonio. Preserve this as employer and employment-offset evidence, not as current industrial inventory or a verified job-loss total.
The Mobile Chamber's July 2026 announcements add two additional industrial project routes. Power and Rubber Supply Facility Mobile County is reported as a planned Mobile County facility with more than $7 million of investment and 55 projected jobs over five years, but the announcement gives no site, delivery, or operating detail. MYER Industries 12780 Saeger Road Grand Bay is a reported $2.3 million renovation and upgrade of an acquired existing facility at 12780 Saeger Road, with 24 projected jobs over four years. Both are announcement-stage evidence, not delivered inventory, realized investment, achieved employment, or market-wide performance.
Power & Rubber's official location directory now identifies a Mobile branch at 1951 West I-65 Service Road North, supplying named operating-employer and location corroboration for the route. The employment page adds an application path and an undated Warehouse Helper listing, but its legacy indicators and lack of Mobile/date specificity mean it is only a hiring-channel lead. Neither page proves delivery of the announced project, current headcount, or realization of the 55 jobs.
MYER's current first-party pages provide an operating-scale and workforce checkpoint for the employer behind the expansion queue: more than 200 teammates, a Mobile shop/field-services application route, and named metal-fabrication occupations. MYER also describes registered government-contractor experience. Its current About page adds a 23-acre facility one mile west of Mobile Regional Airport, more than 100,000 square feet under roof, 90-ton lifting capacity, 12 overhead cranes, 33 jib cranes, and a segregated ASME-code production shop. This strengthens the industrial supplier and labor-demand map, but does not convert the announced expansion into delivered inventory, a specific federal award, or verified incremental jobs.
The August 2026 Airbus announcement adds Airbus Central Distribution Center Mobile, a planned logistics asset at 1501 Raven Drive supporting Brookley Aeroplex assembly operations. It reports more than $82 million in combined Mobile projects, 50 projected jobs, and a Q1 2027 operating target for the distribution center. These are company/project announcement claims, separate from the operating Colliers market series and the existing assembly-line route.
Airbus's May 2026 employer presentation provides a separate operating-scale checkpoint for the Brookley aerospace node: the Mobile manufacturing site is reported at more than 2,000 employees, with a second A320 assembly line opened in October 2025. Preserve this as company-reported site employment and production-capacity evidence, not as an industrial-market inventory, tenant, or absorption series.
Made in Alabama's July 2026 workforce report adds the labor-supply mechanism behind this aerospace node: AIDT reports work with more than 20 aviation and aerospace companies and more than 6,000 Alabamians trained for aerospace careers. The figure is a statewide cumulative training measure, not an industrial inventory or Mobile placement count, but it strengthens the workforce-capacity route supporting Brookley manufacturing and logistics.
Airbus U.S. Space & Defense's March 2026 Aviation Mechanic/A&P contract posting adds a current skilled-labor signal at 8100 Airbus Military Drive. It is relevant to the Brookley aerospace employment route and government-linked production ecosystem, but one vacancy does not establish industrial absorption, contract scale, filled employment, or payroll.
The Mobile Chamber's Calvert announcement adds Jefferson Shredding Calvert Facility Mobile County, a co-location project at Outokumpu's Calvert facility. It reports $22.4 million of planned investment and 15 new Mobile County jobs. The announcement does not establish facility size, delivery, lease terms, occupancy, current operations, or achieved employment; retain it as project-pipeline evidence.
Outokumpu's August 2026 scholarship and internship release adds a workforce-depth control for the Calvert metals route: the first engineering-scholarship recipient was a Mobile-native South mechanical-engineering student who interned at the Calvert mill. It documents a local employer-to-university talent pathway, not plant headcount, permanent hiring, or manufacturing throughput.
The Chamber's 2024 project release adds named industrial and logistics routes beyond the current operating screen: Birdon's planned Waterway Commerce Cutter shipyard expansion with 136 announced jobs, Frito-Lay's planned 25,000-square-foot Prichard distribution facility with 50 announced jobs, and Proplate's planned steel-fabrication facility with 30 jobs over three years. These are useful employer and project candidates, but the release does not prove delivery, operating throughput, filled jobs, or industrial absorption.
Birdon's first-party June 2025 update confirms construction-stage activity at Bayou La Batre and more than $27 million in shipyard capital improvements underway, while Proplate's current profile identifies an open Chunchula facility and a move to two-shift production after welcoming new employees. These add operating-stage and production-capacity evidence to the named project routes, but neither supplies a local payroll or net-employment series.
The Eco Material Plant Barry Ash Harvesting Facility adds a north-Mobile circular-materials route. Eco Material and Alabama Power announced a Plant Barry processing facility expected to enter service in January 2026, with approximately 600,000 dry tons per year of material and an announced full-capacity operating team of about 25 employees, separate from temporary construction labor. The date and staffing figure remain project-announcement targets; current completion, throughput, filled employment, and payroll still require follow-up.
Alabama Power's current compliance page confirms the established Plant Barry host facility is an operating power plant whose employees are part of the local economy. Preserve that host-employer control separately from Eco Material's new-facility completion and staffing question.
The Frito-Lay Prichard route now has a property-stage cross-check: Matthews identifies a new ±23,018-square-foot Product Exchange Center at 3211 Anton Street and reports a 10-year industrial NNN lease commencing in May 2025. The memorandum is unverified broker/owner-supplied material, so it supports lease-status and facility diligence rather than throughput, occupancy, employment, or marketwide industrial performance.
GAO's current DHS assessment adds a government-sourced workforce layer to the Birdon shipyard route: about 145 personnel were reported at the yard in September 2025 versus a planned 175, and Birdon estimated about 400 workers would be needed for four WCCs per year. Preserve this as program-scale and workforce-risk evidence, not as a Mobile industrial payroll or absorption series.
The Mobile Portside Buildings D and N report adds an independent transaction and lease-status cross-check within SALP. REBusinessOnline reports 373,015 square feet across two 2023-built buildings, fully leased at the time of the 2025 sale, with 32- to 36-foot clear heights and 180- to 185-foot truck courts; the sales price was not disclosed. This is property-level evidence and does not replace the Colliers market series or establish current occupancy, rents, tenant credit, or marketwide sales. One Liberty's June 2025 owner presentation adds a primary cross-check for the same portfolio: a $49 million January 2025 acquisition, 371,586 square feet, four tenants, approximately seven years of weighted-average lease term, $3.08 million of year-one base rent, and approximately $8.30/SF of in-place base rent. The 371,586-square-foot owner figure differs from REBusinessOnline's 373,015-square- foot report; the discrepancy is preserved rather than normalized. These figures strengthen the property-level transaction lane but do not create a market-wide rent, vacancy, or inventory series.
Merrill P Thomas adds two current yard routes: 5275 Hamilton Boulevard Mobile, a 0.77-acre fenced industrial yard in Theodore described with I-1 zoning, and 445 Diaz Street Prichard, a 4.57-acre fenced laydown yard near I-65, I-10, the Port, and Mobile International Airport. These listings extend asset-level logistics navigation but do not establish asking price or rent, ownership, tenant, executed lease, utilization, or submarket performance.
Merrill P Thomas adds two additional warehouse/flex property screens. 6251 Highway 90 Theodore Office Warehouse is presented as an approximately 3.3-acre industrial site with an approximately 10,500-square-foot main building and 8,500-square-foot pole barn. 7871 and 7851 Schillinger Park West Warehouse is presented as a 14,402-square-foot warehouse on approximately 2.19 acres with fenced yard, dock-high and van-height loading, and reported recent improvements. Both extend current property-level industrial navigation; neither establishes a closed sale, executed lease, verified zoning or measurements, tenant, occupancy, rents, throughput, or operating performance.
Brevitas adds a current industrial investment-listing cross-check at 4070 Halls Mill Road Mobile: an active $3.0487 million offering for a reported 27,000-square-foot, 1.83-acre single-tenant property with 100% occupancy and a long-term Core & Main Fire Protection lease. The listing reports 3,100 SF office, dock/grade access, 20-foot eaves, and 600-amp three-phase power. It remains active-listing evidence, not a closed sale, audited lease abstract, or marketwide benchmark.
Betbeze Realty adds an independent light-industrial sale/lease cross-check at 3038 Dial Street Mobile. The listing describes a 4,800-square-foot office/warehouse facility plus a 900-square-foot storage building on approximately 1.6 acres, with $250,000 asking sale and $2,500/month asking lease terms. It improves property-level industrial diligence around small-bay office/warehouse stock, but remains broker-reported asking evidence rather than an executed transaction, tenant record, or submarket benchmark.
Betbeze Realty's managed-properties page adds four current office/warehouse availability routes: 1166 West I-65 Service Road South Mobile at 5,600 SF and $2,500/month, 3345 Halls Mill Road Mobile with 3,150 SF available at $1,250/month within a 14,000 SF property, 1125 Corporate Drive North Mobile with a 2,750 SF suite at $1,450/month within a 24,500 SF building, and 3307 Halls Mill Road Mobile at 2,500 SF and $900/month. The page also names selected tenants and occupancy claims; these remain manager/broker portfolio evidence, not complete rent rolls, executed leases, or marketwide industrial performance.
Delaney Land and Realty adds an independent North Broad Street candidate-asset screen at 50 N Broad Street Mobile Office Warehouse. The page describes approximately 6,000 square feet split between general office and warehouse space, displays a $175,000 asking disposition price, and directs prospective tenants to call for a lease rate. It is useful for small-bay office/warehouse navigation, but the page date is unstated and it does not establish current availability, ownership, tenant, executed lease, achieved rent, condition, or industrial-market performance.
Underwriting Use
- Use the Colliers table for provider-defined industrial market and submarket context, not for property-level rent or tenant underwriting.
- Preserve the port, airport, highway, rail, flood/wind, environmental, utility, and labor-access diligence questions at the corridor and asset level.
- Treat the reported $139 million sales volume as a market-liquidity signal, not a valuation or cap-rate benchmark.
- Confirm whether a candidate asset sits in CBD, Midtown, Northeast Mobile, Outlying Mobile County, Prichard/Saraland, West Mobile, or an adjacent Baldwin County geography before applying the figures.
Related Pages
-
Mobile, AL Investment Hub
-
Port of Mobile and Brookley Aeroplex
-
North Brookley Industrial Land Mobile
-
Mobile Harbor Modernization Project
-
Airbus Mobile Second A320 Final Assembly Line
-
Austal USA Mobile Expansion
-
Aerostar Mobile Aeroplex Expansion
-
50 N Broad Street Mobile Office Warehouse
-
Bender CCP Mobile
-
2565 Government Boulevard Mobile Warehouse Suites
-
Halls Mill Industrial Park Mobile
-
250 Jacintoport Boulevard Mobile
-
6420 Wall Street Mobile
-
840 Lakeside Drive Mobile
-
Evonik Project MAL Mobile
-
Power and Rubber Supply Facility Mobile County
-
MYER Industries 12780 Saeger Road Grand Bay
-
Airbus Central Distribution Center Mobile
-
Jefferson Shredding Calvert Facility Mobile County
-
Outokumpu Calvert Stainless Steel Facility Mobile County
-
APM Terminals Mobile Intermodal Rail Facility
-
Mobile Downtown and Waterfront
-
MYER Companies Mobile Manufacturing Expansion
-
Novelis Bay Minette Aluminum Facility
-
Canfor Axis Sawmill
-
Gulf Distributing Downtown Mobile Distribution Facility
-
5275 Hamilton Boulevard Mobile
-
445 Diaz Street Prichard
-
6251 Highway 90 Theodore Office Warehouse
-
7871 and 7851 Schillinger Park West Warehouse
-
3038 Dial Street Mobile
-
3345 Halls Mill Road Mobile
-
3307 Halls Mill Road Mobile
-
2406 Halls Mill Road Mobile
-
4070 Halls Mill Road Mobile
-
Austal USA Mobile Expansion
Sources
- Source: Colliers Mobile Industrial Q4 2025
- Source: Mobile County South Alabama Logistics Park Announcement
- Source: City of Mobile Local Recovery Plan 2024
- Source: Mobile Chamber 2026 Economic Outlook 2025
- Source: Alabama Port Authority Mobile Harbor Modernization Completion 2025
- Source: HigherGov Mobile Harbor Deepening and Widening Phase 6 Contract
- Source: Austal USA Submarine Module Facility and Production Expansion 2025
- Source: Mobile Chamber Austal LCU 1714 Construction Start 2026
- Source: Mobile Chamber APM Terminals Intermodal Rail Expansion 2025
- Source: Mobile County Evonik Project MAL Amendment 2026
- Source: Mobile Chamber Power and Rubber Supply Facility 2026
- Source: Novelis Bay Minette Careers and Employment Driver 2026
- Source: Novelis Bay Minette Construction Progress 2025
- Source: Novelis Bay Minette Job Board 2026
- Source: Power and Rubber Supply Mobile Location 2026
- Source: Power and Rubber Supply Current Employment 2026
- Source: Mobile Chamber Dynasty Fab Chickasaw Expansion 2025
- Source: Business Alabama Dynasty Fab Chickasaw Operations 2025
- Source: AAA USA Official Careers Mobile 2026
- Source: AAA USA Academy Mobile Training 2026
- Source: AAA USA Official Job Board Mobile 2026
- Source: AAA USA Mobile Contact and Training Center 2026
- Source: AAA USA Training Center Grand Opening 2025
- Source: SSAB Alabama Axis Q&T Expansion 2025
- Source: Mobile Chamber SSAB Alabama Axis Expansion 2025
- Source: SSAB Alabama Axis Location 2026
- Source: Canfor Axis Sawmill Operating Employer 2025
- Source: Canfor Axis Sawmill Location and Employment 2026
- Source: Gulf Distributing Mobile Employer Profile 2026
- Source: Gulf Distributing Mobile Careers 2026
- Source: Gulf Distributing Mobile Downtown Distribution Facility 2024
- Source: Mobile Chamber MYER Industries Grand Bay Facility 2026
- Source: MYER Companies Current Careers 2026
- Source: MYER Companies Mobile Shop Employment Application 2026
- Source: MYER Companies Government Contractor Capabilities 2026
- Source: MYER Companies About and Operating Footprint 2026
- Source: Airbus Central Distribution Center Mobile 2026
- Source: Airbus Mobile Aviation Mechanic A&P Contract Opening 2026
- Source: Made in Alabama Aerospace Workforce Training 2026
- Source: Mobile Chamber Jefferson Shredding Calvert Facility 2026
- Source: Aerostar Mobile Aeroplex Expansion 2024
- Source: Mobile Chamber Economic Development Numbers 2024
- Source: Birdon WCC Construction and Workforce 2025
- Source: Proplate Chunchula Operating Expansion 2026
- Source: Eco Material Technologies and Alabama Power Plant Barry Ash Harvesting
- Source: Alabama Power Plant Barry Current Operations 2026
- Source: Frito-Lay Prichard Lease and Facility 2025
- Source: GAO Birdon WCC Workforce 2026
- Source: Right Space Mobile Commercial Leasing Activity May 2026
- Source: MyStateMLS 3107 Spring Hill Avenue Mobile Commercial Warehouse Sale 2025
- Source: CRE Mobile Featured Property Listings 2026
- Source: REBusinessOnline Mobile Portside Industrial Sale 2025
- Source: One Liberty Properties Mobile Portside Investor Presentation 2025
- Source: Merrill P Thomas 5275 Hamilton Boulevard Industrial Yard 2026
- Source: MPT 6251 Highway 90 Theodore Office Warehouse 2026
- Source: MPT 7871 and 7851 Schillinger Park West Warehouse 2026
- Source: Merrill P Thomas 445 Diaz Street Prichard Laydown Yard 2026
- Source: Brevitas 4070 Halls Mill Road Industrial Sale 2026
- Source: Gulf Coast Property Group CRE Pulse Mobile May 2026
- Source: South Alabama Logistics Park Tenant and Current Campus Updates 2024–2025
- Source: Alabama Port Authority Mobile Careers 2026
- Source: Simpson Strong-Tie and VEYER SALP Announcement 2024
- Source: Simpson Strong-Tie and VEYER Open at SALP
- Source: Mobile Chamber Gulf Sterilization Mobile Facility
- Source: Gulf Sterilization Mobile Operating Profile
- Source: Mobile Gateway Park Industrial Rail Development Site 2026
- Source: Betbeze 3038 Dial Street Mobile Office Warehouse Listing 2026
- Source: Betbeze Mobile Managed Industrial Properties 2026
- Source: Mobile Aeroplex North Brookley Real Estate IFB 2025
- Source: Delaney Robbins North Mobile Office Warehouse 2026
- Source: Bender CCP Mobile Facility 2026
- Source: Bender CCP Current Navy Contract and Hiring Control 2026
- Source: Mobile Airport Authority Aeroplex Infrastructure 2026