Greater Quebec City entered Q2 2026 with a second consecutive quarter of positive absorption. The market is tightening at the aggregate level, but its pipeline is unusually mixed: Colliers says most of the 1.333M SF under construction is specialized or data-centre development rather than ordinary warehouse delivery.
Current Measurements
| Metric | Value | Period | Source |
|---|---|---|---|
| Inventory | 41.598M SF | Q2 2026 | Source: Colliers Quebec City Industrial Market Report Q2 2026 |
| Vacancy / availability | 4.9% / 5.6% | Q2 2026 | Source: Colliers Quebec City Industrial Market Report Q2 2026 |
| Q2 net absorption | +48,096 SF | Q2 2026 | Source: Colliers Quebec City Industrial Market Report Q2 2026 |
| New supply / under construction | 0 / 1.333M SF | Q2 2026 | Source: Colliers Quebec City Industrial Market Report Q2 2026 |
| Weighted average asking net rent | $13.64/SF | Q2 2026 | Source: Colliers Quebec City Industrial Market Report Q2 2026 |
Market Read
Centre de Québec led with 40,733 SF of absorption and 2.6% vacancy. Saint-Augustin-de-Desmaures added 59,857 SF of absorption, while Rive-Sud Est added 28,185 SF but remained 15.7% vacant. La Cité-Limoilou recorded -69,770 SF of absorption and 7.7% vacancy. The dispersion argues for submarket-level underwriting rather than a simple regional vacancy conclusion.
Functional small- and mid-bay space with adequate clear height, loading, and highway access is leasing most readily. The report links demand to a tight regional labour market and direct highway access, while tariff uncertainty remains a risk for exposed Quebec sectors.
Data-Centre and Pipeline Caveat
Microsoft’s first-phase hyperscale data-centre development in L’Ancienne-Lorette accounts for a major part of the specialized pipeline, alongside projects such as Toromont’s 90,000-SF facility in Saint-Augustin-de-Desmaures. Underwrite the 1.333M SF construction figure by project, use, power, delivery, and pre-leasing; do not treat it as equivalent to speculative bulk-logistics supply.
Underwriting Implications
- Use the submarket rows to separate tight Centre de Québec and Rive-Sud Ouest from high-vacancy Rive-Sud Est and La Cité-Limoilou.
- Favor functional small-/mid-bay product with highway access and loading quality.
- Treat data-centre and specialized construction as a separate demand and power-underwriting lane.
- Keep Colliers’ source-family boundary distinct from Montreal, Moncton, and other Canadian industrial surveys.
Related Pages
- Industrial Hub
- National Industrial Capital Allocation 2026
- Data Center Underwriting and Powered Land
- Moncton Industrial and Logistics Market
Sources
- Source: Colliers Quebec City Industrial Market Report Q2 2026