Powered-land diligence should separate Eagle Mountain / northwest Utah County large-load projects from Lehi office narratives and require power, water, and interconnection proof.
Current Public Metrics
Utah Inland Port Authority's June 2026 policy statement says land-use authority remains with local governments, UIPA is not recruiting data centers, and local review/environmental safeguards remain required. Provo's February 2026 planning agenda separately records a request for a new 66,000-square-foot data center at 1507 South 180 East, while Utah's April ordinance notice records updated power-generation, evaporative-cooling, and environmental-reporting requirements. These are policy and planning signals, not evidence of approval, delivery, energization, available powered land, interconnection, fiber, water, or data-center inventory; the property-data lane remains bounded by the available policy and planning records.
Rocky Mountain Power's February 2026 Utah large-load agreement adds statewide utility cost-allocation and reliability context. It is not a Provo-Orem-Lehi site record and does not establish local capacity or inventory; local feasibility conclusions remain bounded by the available utility record.
Public source upgrade: this page should preserve strict CBSA boundaries, label broader source geographies, and keep project-specific claims separate from market-wide metrics.
Underwriting Use
- Use this page as a diligence lane inside Provo-Orem-Lehi Geography Hub.
- Preserve the source geography: CBSA, county, city, airport, port, tourism region, broker market, corridor, utility territory, or project.
- Promote hard metrics into structured data only when the public source defines geography, period, property type, and methodology clearly enough.
Acquisition Budget Questions
- What rent, vacancy, expense, tax, insurance, capex, and absorption assumptions are directly supported by public or preserved source material?
- Which assumptions are market-wide and which are corridor-specific?
- What is the downside case if supply, rates, insurance, tenant credit, public funding, infrastructure, or demand anchors move against the pro forma?
Asset Management Watch Items
- Actual leasing velocity versus acquisition absorption.
- Actual expenses, taxes, insurance, payroll, repair, and capex versus budget.
- Tenant / resident quality, renewal spread, concessions, delinquency, and rollover timing.
- New competing supply, infrastructure delays, employer announcements, utility constraints, and policy changes.
Related Nodes
- Downtown Provo BYU and Civic Core
- Orem UVU University Parkway Retail Corridor
- Lehi Silicon Slopes and Thanksgiving Point Tech Corridor
- American Fork Pleasant Grove I-15 Growth Node
- Vineyard Geneva and Utah Lake Redevelopment Edge
- Spanish Fork Springville South Utah County Growth Corridor
- Payson Santaquin and Southern Utah County Edge
- Provo Airport and East Bay Logistics Node
- Eagle Mountain Saratoga Springs Northwest Growth Watchlist
- Juab County Nephi I-15 Outlying Edge
Review Notes
- 2026-06-15 review: promoted / confirmed as reviewed Provo-Orem-Lehi branch-routing and market-intelligence framework coverage. Use as source-scoped geography context; public 2025/2026 market-grade CRE tables, property-level facts, live rent / vacancy metrics, utility capacity, permitting, transaction, and asset-level claims still require local source notes, structured DB observations, or primary records before public/API or pro forma use.
Sources
- Source: Provo-Orem-Lehi DFW-Parity Public Source Stack 2026
- Source: US Census ACS Provo-Orem-Lehi Demographic Backfill 2026
- Source: Provo Retail Industrial and Policy Wave 2026
- Source: Provo Data-Center Planning Evidence 2026
- Source: Utah Rocky Mountain Power Large-Load Agreement 2026