Current Public Metrics
Powered-land is a watchlist around low-cost land and grid / water constraints; data-center underwriting needs utility, fiber, site-control, and entitlement evidence.
Current Evidence Review
The current Modesto source stack does not establish utility capacity, fiber routes, water availability, substation capacity, site control, or entitlement evidence for a data-center or powered-land claim. This lane remains an explicit gap by design; no structured observation or availability claim was created.
Underwriting Use
- Use this page as a diligence lane inside Modesto Geography Hub.
- Preserve the source geography: CBSA, county, city, airport, port, tourism region, broker market, corridor, utility territory, or project.
- Promote hard metrics into structured data only when the public source defines geography, period, property type, and methodology clearly enough.
Acquisition Budget Questions
- What rent, vacancy, expense, tax, insurance, capex, and absorption assumptions are directly supported by public or preserved source material?
- Which assumptions are market-wide and which are corridor-specific?
- What is the downside case if supply, rates, insurance, tenant credit, public funding, infrastructure, or demand anchors move against the pro forma?
Asset Management Watch Items
- Actual leasing velocity versus acquisition absorption.
- Actual expenses, taxes, insurance, payroll, repair, and capex versus budget.
- Tenant / resident quality, renewal spread, concessions, delinquency, and rollover timing.
- New competing supply, infrastructure delays, employer announcements, utility constraints, and policy changes.
Related Nodes
- Downtown Modesto Civic and Office Core
- Modesto Airport and Beard Industrial District
- Highway 99 North Modesto Logistics Corridor
- Vintage Faire Mall and North Modesto Retail Node
- Riverbank Oakdale Northeast Stanislaus Growth Edge
- Ceres South Modesto Highway 99 Corridor
- Turlock Stanislaus State and Healthcare Node
- Patterson I-5 West Stanislaus Logistics Edge
- Crows Landing Industrial Business Park Watchlist
- Salida Kiernan Avenue North County Growth Corridor
Review Notes
- 2026-06-15 review: promoted / confirmed as reviewed Modesto branch-routing and market-intelligence framework coverage. Use as source-scoped Northern Central Valley / official CBSA
33700context; public 2025/2026 market-grade CRE tables, property-level facts, live rent / vacancy metrics, utility and water capacity, permitting, I-5 / Highway 99 logistics absorption, data-center suitability, tenant-credit, transaction, and asset-level claims still require local source notes, structured DB observations, or primary records before public/API or pro forma use. - 2026-08-08 evidence review: rechecked the current municipal and infrastructure source stack; no admissible powered-land evidence was found, so the gap remains open rather than being cleared by adjacent industrial projects.
Sources
- Source: Modesto DFW-Parity Public Source Stack 2026
- Source: US Census ACS Modesto Demographic Backfill 2026