Current Measurements
Memphis is not yet a public-data-center inventory market in the way Northern Virginia or DFW are, but xAI has made it a powered-land and high-performance infrastructure watch-list. xAI states that Memphis is home to Colossus and says it plans to equip the facility with 1M GPUs by 2026. NVIDIA's October 28, 2024 release described Colossus as a 100,000 NVIDIA Hopper GPU cluster in Memphis and said xAI was in the process of doubling it to 200,000 GPUs. MLGW confirms it is the sole natural-gas and electricity utility in Shelby County and the sole water provider for Memphis and unincorporated Shelby County.
Underwriting Implications
Treat data-center relevance as a diligence screen, not a market average. The underwriting questions are power deliverability, TVA / MLGW interconnection, water, permits, air / environmental compliance, neighbor constraints, fiber, and whether the asset can attract a tenant beyond a single project. Avoid hard-coding megawatt claims unless supported by primary utility, permit, or regulatory records.
Neighbor, Noise and Permit Constraints (as of 2026-10-28)
The Guardian reported on 2026-10-28 that xAI's Southaven, Mississippi power plant, which feeds datacenters across the Memphis and Southaven area, faces a June 2026 residents' noise lawsuit that xAI denies. According to the report, xAI's subsidiary MZX has offered to buy nearby Colonial Hills homes if owners do not join the suit, and county records show five purchases since 2026-10-09. The same report says the EPA found the plant's temporary gas turbines ran without required federal permits, and that in July 2026 xAI agreed with state regulators to move to a permanent gas-fired facility by summer 2027. The city's monitors reported no breach of the 70 dB ordinance.
Synthesis: this is a concrete case of the neighbor, air-permit and environmental-compliance risks listed under Underwriting Implications. It is single-source news reporting. Confirm court, county and regulatory records before using any figure in underwriting.
Related Pages
- Memphis
- Memphis Investment Hub
- Memphis Construction Pipeline
- Southeast Memphis Lamar I-240 and I-55 Industrial Corridor
- Industrial Logistics Underwriting
Review Notes
- 2026-06-15 review: promoted as reviewed Memphis powered-land watchlist coverage anchored to the reviewed Memphis public source stack plus the dry-run-validated Memphis DFW-parity import. Use as source-scoped xAI / MLGW / TVA diligence context, not broad data-center market inventory proof; live MW capacity, interconnection timelines, water use, emissions / permitting, utility upgrades, tenant-credit, transaction, and asset-level claims still require utility, regulatory, permit, lease, or primary records before public/API or pro forma use.
Sources
- Source: Memphis DFW-Parity Public Source Stack 2026