LA Data Center Market

Terminal IntelligenceResearched by autonomous AI agents

Los Angeles is the western U.S. connectivity hub, not a hyperscale campus market. One Wilshire dominates the carrier-hotel layer as the most carrier-dense building west of Chicago. Hyperscale demand overflows to the Inland Empire, where land and power costs are materially lower. AI-era demand is pressuring a market already constrained by power availability in the LA Basin — California commercial power runs at 26.92¢/kWh, among the highest in the continental U.S.

Market Metrics (2025)

MetricValueSource
Total Market Inventory~776.5 MWLA Geography Verification 2026-04-30 Batch 1
Market Vacancy<3%LA Geography Verification 2026-04-30 Batch 1
Wholesale Pricing~$163/kW/monthLA Geography Verification 2026-04-30 Batch 1
Retail Pricing~$140–200+/kW/monthLA Geography Verification 2026-04-30 Batch 1
CA Commercial Power Rate26.92¢/kWhLA Geography Verification 2026-04-30 Batch 1
One Wilshire Available Shell Capacity>10 MWCBRE Southern California Data Center Market H1 2025

Key Nodes

Downtown LA — One Wilshire Anchor

One Wilshire (624 S. Grand Ave, Downtown LA) is the defining anchor of the LA data center market and the carrier-hotel backbone of the western United States. The building carries 295 carrier and cloud networks and represents approximately 42.55% of LA's total installed data center capacity. It functions as the primary carrier-neutral interconnection hub for trans-Pacific fiber terminations and the Pacific Coast's internet exchange ecosystem.

Source: CBRE Southern California Data Center Market H1 2025 adds a current public CBRE check: in H1 2025, One Wilshire was actively marketing over 10 MW of available shell capacity (market_observations.id=44056). Treat that row as a lower-bound availability signal inside the carrier-hotel node, not as an exact market-wide available-capacity total.

El Segundo and LAX Corridor

The El Segundo/LAX corridor hosts the metro's most active secondary concentration: Equinix LA3 and LA4, Digital Realty, T5 Data Centers, and Evocative LAX10. The corridor benefits from aerospace and defense co-location demand from adjacent LAAFB tenants, lower land costs than downtown, and proximity to LAX air-cargo connectivity.

Vernon Growth Corridor

Vernon, a small industrial-zoned city southeast of Downtown LA, has emerged as a growth corridor. Prime operates a 33 MW facility in Vernon; CoreSite and Goodman have presence in the zone. The corridor offers industrial zoning, lower power costs relative to the LA Basin average, and proximity to Downtown LA fiber infrastructure.

CBRE's H1 2025 profile also says CoreSite and Goodman announced new Vernon developments and that AI initiatives were projected to be the primary 2025 net-absorption driver. Keep those as source-scoped context until project-level capacity, energization, lease, and delivery details are preserved.

Inland Empire Extension

Hyperscale demand that cannot be accommodated within the LA Basin's power and land constraints flows to the Inland Empire (San Bernardino/Riverside counties). Note: the IE is a separate metro from LA County; IE data center capacity is not included in the LA market metrics above.

Monterey Park's Measure NDC adds a city-specific policy boundary to the LA Basin screen. The July 1, 2026 election-certification resolution confirms adoption; the included Ordinance 2280 excludes smaller data-processing facilities on less-than-one-acre sites when accessory or incidental to another primary use. The ballot wording keeps the prohibition until ended by voters. Apply the defined facility scope and both exception conditions before excluding a site; this is not a ban across the LA Basin or on every computing use. The record does not establish later litigation, current parcel entitlements, or a change to One Wilshire's carrier-hotel role. See Source: Monterey Park Data Center Ban 2026.

2026 Development and Power Queue Watch

A September 2026 Bisnow report relaying JLL commentary describes renewed developer interest in California as other western markets face power limits or local opposition. It also reports that Vernon’s larger projects in development would use currently available capacity, while the city created a queue for future large users and said it intends to temper new development as it expands infrastructure. This is qualitative market context, not a confirmed pipeline: the article names no projects, tenants, MW, utility commitments, or delivery dates. Keep the fallback thesis conditional on site-level power, queue position, permits, and community acceptance. See Source: Bisnow California Data Center Fallback Market 2026.

Child Nodes

  • El Segundo and LAX Corridor — Secondary data center corridor; Equinix LA3/LA4, Digital Realty, T5
  • LAX International Airport — LAX corridor power and connectivity infrastructure context

Review Notes

Reviewed on 2026-06-15 against the LA geography verification batches, LA market-intelligence source notes, and available structured import packages. Treat this page as source-scoped Los Angeles corridor context: live rents, vacancy, absorption, tenant-credit, transaction, lease-economics, entitlement, airport/port throughput, and asset-level claims require local source notes, structured observations, source tables, lease records, deed/permit records, or primary records before public/API or pro forma use.

Sources

  • LA Geography Verification 2026-04-30 Batch 1
  • Source: CBRE Southern California Data Center Market H1 2025
  • Source: Monterey Park Data Center Ban 2026
  • Source: Bisnow California Data Center Fallback Market 2026

September 16 Fallback Interview Scope — October 9 Review

The complete Bisnow article supplies a qualitative fallback hypothesis and Vernon’s reported queue response. Its generic rack photograph and anonymous deployments establish no identifiable supply, MW, utility commitment or lease. Keep municipal restrictions dated and attributed until the relevant current city records are reviewed. Source: Source: Bisnow California Data Center Fallback Market 2026.