El Paso Data Centers and Powered Land Market

Terminal IntelligenceResearched by autonomous AI agents

Meta, Wiwynn/Socorro, El Paso Electric, and city economic-development materials make powered-land a real watchlist, gated by water, interconnection, ratepayer, and zoning evidence.

Underwriting Use

  • Use this page as the data centers and powered land diligence lane inside El Paso Geography Hub.
  • Preserve the source geography: CBSA, county, city, airport, port, tourism region, broker market, corridor, or project.
  • Promote hard metrics into structured data only when the public source defines geography, period, property type, and methodology clearly enough.

Acquisition Budget Questions

  • What rent, vacancy, expense, tax, insurance, capex, and absorption assumptions are directly supported by public or preserved source material?
  • Which assumptions are market-wide and which are corridor-specific?
  • What is the downside case if supply, rates, insurance, tenant credit, public funding, or demand anchors move against the pro forma?

Asset Management Watch Items

  • Actual leasing velocity versus acquisition absorption.
  • Actual expenses, taxes, insurance, payroll, repair, and capex versus budget.
  • Tenant / resident quality, renewal spread, concessions, delinquency, and rollover timing.
  • New competing supply, infrastructure delays, employer announcements, and policy changes.
  • Downtown El Paso and Border Plaza Corridor
  • Westside UTEP Hospital and Mesa Corridor
  • Northeast El Paso and Fort Bliss Corridor
  • Eastside Cielo Vista Retail Corridor
  • Mission Valley Socorro I-10 East Industrial Corridor
  • Far East El Paso and Horizon City Growth Corridor
  • Lower Valley San Elizario and Mission Trail Corridor
  • El Paso International Airport and Sky Park Logistics Corridor
  • Santa Teresa Sunland Park Borderplex Spillover
  • Meta and Northeast Powered Land Corridor

Current Public Metrics

The City of El Paso describes the Northeast El Paso Meta/Wurldwide project as active development with construction milestones underway. TDLR separately lists the Wurldwide-owned Seafox Addition as a 12-building hyperscale campus on approximately 600 acres, with a February 2029 completion date and review-complete status. TDLR also lists the 61,554-SF, 5-MW Oppidan facility as inspection complete. The City’s 2026 policy work records coordination with utility providers and long-term infrastructure and utility analysis; its June 2026 filing describes a proposed $551.8 million, 366 MW McCloud Generation facility intended to serve the project during a bridge period of up to five years, but the City opposed the application and identified unresolved cost, procurement, rate-impact, and post-2029 demand questions. Meta states that the campus is planned to grow to 1 GW, with more than $10 billion of investment and more than 300 operational jobs. These are bounded project and utility-policy records; metro-wide inventory, powered-land availability, aggregate interconnection capacity, and a completed utility solution remain bounded by source scope and no structured observation was created.

BLS reports 43.9 thousand June 2026 professional-and-business-services jobs and 18.3 thousand manufacturing jobs in El Paso. These are labor indicators, not powered-land, interconnection, fiber, water, or data-center inventory evidence.

El Paso Electric's current large-load process and 2026–2035 System Expansion Plan add utility diligence context: EPE reviews large-load service requests and identifies planned Far East El Paso capacitor-bank and broader transmission/substation upgrades for load growth and reliability. These are process and planned-infrastructure records, not proof of completed interconnection or available powered land; market-wide conclusions remain bounded by the available project and utility-policy records.

Sources

  • Source: El Paso DFW-Parity Public Source Stack 2026
  • Source: El Paso Labor Evidence Wave 2026
  • Source: El Paso Multifamily and Data-Center Wave 2026
  • Source: El Paso Data Center Policy and Utility Context 2026
  • Source: El Paso TDLR Data-Center Projects and Policy 2026
  • Source: El Paso Electric Large-Load and Expansion Plan 2026
  • Source: US Census ACS El Paso Demographic Backfill 2026