Hospitality is the clearest demand anchor through Daytona Beach, the Speedway, events, and beach tourism, but full hotel KPI must be separately preserved.
Current directional evidence: the Daytona Beach Area Convention and Visitors Bureau's calendar-year 2025 report gives the Halifax Area 55.9% hotel occupancy, $149.10 ADR, and $83.38 RevPAR, with 2,841,300 room nights and $2.736 billion of total visitor economic impact. The Halifax Area is a subset of Volusia County rather than the full CBSA 19660; this is directional hospitality evidence, not a structured CBSA row.
Public source upgrade: this page should preserve strict CBSA boundaries, label broader source geographies, and keep project-specific claims separate from market-wide metrics.
Daytona Beach International Airport capital work is an access and resilience demand anchor for the tourism corridor, not hotel occupancy, ADR, RevPAR, or visitor-spend evidence.
Volusia County's 2026-2027 north and south sand-placement projects add a coastal-resilience and tourism-asset protection anchor. The county reports approximately 700,000 cubic yards for the North Project and shoreline work spanning more than four miles; these records do not establish hotel KPIs, visitor spend, or property-level insurance outcomes.
Underwriting Use
- Use this page as a diligence lane inside Deltona-Daytona Beach-Ormond Beach Geography Hub.
- Preserve the source geography: CBSA, county, city, airport, port, tourism region, broker market, corridor, utility territory, or project.
- Promote hard metrics into structured data only when the public source defines geography, period, property type, and methodology clearly enough.
Acquisition Budget Questions
- What rent, vacancy, expense, tax, insurance, capex, and absorption assumptions are directly supported by public or preserved source material?
- Which assumptions are market-wide and which are corridor-specific?
- What is the downside case if supply, rates, insurance, tenant credit, public funding, infrastructure, or demand anchors move against the pro forma?
Asset Management Watch Items
- Actual leasing velocity versus acquisition absorption.
- Actual expenses, taxes, insurance, payroll, repair, and capex versus budget.
- Tenant / resident quality, renewal spread, concessions, delinquency, and rollover timing.
- New competing supply, infrastructure delays, employer announcements, utility constraints, and policy changes.
Related Nodes
- Daytona Beach Oceanfront and Convention Tourism Core
- Daytona International Speedway and One Daytona
- Daytona Beach International Airport and Embry-Riddle Aviation Node
- Ormond Beach I-95 US-1 Business Corridor
- Deltona I-4 Inland Residential Edge
- DeLand Stetson County Seat and West Volusia Node
- Port Orange Dunlawton Retail and Medical Corridor
- New Smyrna Beach Coastal Tourism Node
- Palm Coast Flagler Growth Corridor
- I-95 LPGA Boulevard Industrial and Residential Growth Corridor
Review Notes
- 2026-06-15 review: promoted / confirmed as reviewed Deltona-Daytona Beach-Ormond Beach branch-routing and market-intelligence framework coverage. Use as source-scoped Volusia / Flagler CBSA geography context; public 2025/2026 market-grade CRE tables, property-level facts, live rent / vacancy metrics, utility capacity, permitting, tourism / event compression, airport throughput, insurance / storm cost, transaction, tenant-credit, and asset-level claims still require local source notes, structured DB observations, or primary records before public/API or pro forma use. The Daytona student-housing refinance source is article-level support only and was not imported as structured market data.
- 2026-08-06 evidence update: added direct coastal-resilience custody while retaining the hotel KPI and property-insurance gaps.
Sources
- Source: Deltona-Daytona Beach-Ormond Beach DFW-Parity Public Source Stack 2026
- Source: US Census ACS Deltona-Daytona Beach-Ormond Beach Demographic Backfill 2026
- Source: Daytona Airport and Development Review 2026
- Source: Volusia Coastal Sand Placement 2026