Current Public Metrics
Current MSA evidence: the Chattanooga Chamber's Q2 2026 Real Estate Quarterly reports 65,018,056 SF industrial inventory, 3.3% vacancy, 182,892 SF net absorption, $7.95/SF average rent, and 2,168,709 SF vacant. The source defines the six-county Chattanooga TN-GA MSA explicitly; no structured row was created.
Public source upgrade: Chattanooga industrial and logistics diligence should preserve strict CBSA 16860 boundaries, label broader source geographies, and keep project-specific claims separate from market-wide metrics.
The Kanasita wastewater and Wilcox Boulevard Bridge projects add current infrastructure and corridor-access context, but do not replace a Chattanooga CBSA industrial operating table.
Current project evidence: a September 2025 City of Chattanooga notice advanced a second amendment to the Economic Impact Plan for the North River Commerce Center Industrial Park and redevelopment of North Access Road. This is a project and access-infrastructure anchor, not proof of delivered inventory, tenant commitments, or CBSA-wide absorption.
The city's e2i2 wastewater program adds a current public-infrastructure anchor along I-75: Phase 1 reports $39 million in local investment and approximately 40 million gallons of wet-weather storage across two equalization stations, with completion scheduled for 2027. This supports infrastructure and growth- capacity diligence but does not establish utility capacity for a specific site or alter the Chamber's MSA industrial operating row.
Underwriting Use
- Use this page as a diligence lane inside Chattanooga Geography Hub.
- Preserve the source geography: CBSA, county, city, airport, tourism region, broker market, corridor, utility territory, or project.
- Promote hard metrics into structured data only when the public source defines geography, period, property type, and methodology clearly enough.
Acquisition Budget Questions
- What rent, vacancy, expense, tax, insurance, capex, and absorption assumptions are directly supported by public or preserved source material?
- Which assumptions are market-wide and which are corridor-specific?
- What is the downside case if supply, rates, insurance, tenant credit, public funding, infrastructure, or demand anchors move against the pro forma?
Asset Management Watch Items
- Actual leasing velocity versus acquisition absorption.
- Actual expenses, taxes, insurance, payroll, repair, and capex versus budget.
- Tenant / resident quality, renewal spread, concessions, delinquency, and rollover timing.
- New competing supply, infrastructure delays, employer announcements, utility constraints, and policy changes.
Related Nodes
- Downtown Chattanooga Riverfront and Innovation District
- Erlanger UTC and Medical Education Corridor
- Chattanooga Airport and Enterprise South Logistics Node
- Volkswagen Enterprise South Auto Manufacturing Corridor
- Hixson Highway 153 Retail and Residential Corridor
- Ooltewah Collegedale East Hamilton Growth Edge
- Lookout Mountain St Elmo Tourism Node
- North Georgia I-75 Ringgold Fort Oglethorpe Edge
- Southside Main Street Adaptive Reuse Corridor
- TVA EPB Fiber and Powered Land Watchlist
Review Notes
- 2026-06-15 review: promoted / confirmed as reviewed Chattanooga branch-routing and market-intelligence framework coverage. Use as source-scoped Tennessee-Georgia / official CBSA
16860context; public 2025/2026 market-grade CRE tables, property-level facts, live rent / vacancy metrics, utility capacity, permitting, TVA / EPB powered-land feasibility, Volkswagen / auto-supplier absorption, tourism compression, tenant-credit, transaction, and asset-level claims still require local source notes, structured DB observations, or primary records before public/API or pro forma use.
Rossville adaptive-reuse case
Peerless Mill Building 21 adds a Georgia asset case inside the broader Chattanooga market. Keep its historical broker dimensions, proposed related-party purchase, roof scope and yard revenue separate from MSA vacancy, rent and delivered inventory. The asset page compares a low-basis operating hypothesis with condition, funding and tenant-demand risks; it does not establish a completed sale or achieved NOI. source-peerless-mill-building-21-leasing-2022. source-rss-61479432384f526a6dd9595f.
Sources
- Source: Chattanooga DFW-Parity Public Source Stack 2026
- Source: US Census ACS Chattanooga Demographic Backfill 2026
- Source: Chattanooga Infrastructure Projects 2026
- Source: Chattanooga Chamber Real Estate Quarterly Q2 2026
- Source: Chattanooga North River Commerce Center 2025
- Source: Chattanooga e2i2 Wastewater 2026